My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> ' All business driveways shall remain open except as necessary to permit <br /> curing of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> ' to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units <br /> during the hours of darkness. <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> ' restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work, at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as <br /> ' possible. Keep the streets, sidewalks and private driveways open except for <br /> the brief periods when actual Work is being done. <br /> ' No lane closures will be permitted between 3:30 p.m. and 6:00 p.m., unless <br /> specifically approved by the Engineer. <br /> 1-07.24 Rights of Way <br /> ' Delete1-07.24 and substitute the following: <br /> Street right of way lines, limits of easements, and limits of construction permits are <br /> indicated on the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> Generally, the City will have obtained, prior to bid opening, all rights of way and <br /> easements, both permanent and temporary, necessary for carrying out the Work. <br /> ' Exceptions to this are noted on the Plans. <br /> Whenever any of the Work is accomplished on or through property other than public <br /> right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> ' easement agreement obtained by the City from the owner of the private property. <br /> Copies of the easement agreements may be included in the Contract Documents or <br /> made available to the Contractor as soon as practical after they have been obtained by <br /> ' the Engineer. <br /> The Contractor shall not proceed with any portion of the Work in areas where right of <br /> way, easements or rights of entry have not been acquired until the Engineer certifies to <br /> the Contractor that the right of way or easement is available or that the right of entry <br /> has been received. If the Contractor is delayed due to acts of omission on the part of <br /> the City in obtaining easements, rights of entry or right of way, the Contractor will be <br /> ' entitled to an extension of time. The Contractor agrees that Delay resulting from City <br /> obtaining easement or right of entry or right of way shall not be a breach of Contract. <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br /> ' This includes entry onto easements and private property where private improvements <br /> must be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the <br /> ' City, any additional land and access thereto that the Contractor may desire for <br /> temporary construction facilities, storage of materials, or other Contractor needs. <br /> However, before using any private property, whether adjoining the Work or not, the <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP-109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.