KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall not sublet to a single Subcontractor more than one-half of the Project. <br /> The City may refuse to approve any subcontract for any reason. Subcontractors will <br /> be considered agents of the Contractor and their work shall be subject to the <br /> provisions of the Contract. References in the Contract Documents to actions required <br /> of Subcontractors, manufacturers, suppliers, or any person other than the Contractor, <br /> the City or the City's Representative shall be interpreted as requiring that the <br /> Contractor shall require such Subcontractor, manufacturer, supplier or person to <br /> perform the specified action. <br /> 1-08.1(2) Subcontractor Payment <br /> (******) <br /> Contractor shall comply with RCW 39.04.250 and RCW 39.76.011, as amended, and <br /> any successor and other laws, ordinances, and regulations regarding payment of <br /> Subcontractors. <br /> 1-08.3 Progress Schedule <br /> 1-08.3(1) General Requirements <br /> Delete 1-08.3(1) and substitute the following: <br /> 1-08.3(1) General <br /> (******) <br /> Because time is of the essence, diligent and expeditious progress and completion of <br /> the Work by the Contract Completion Date is required of the Contractor. Careful, <br /> adequate, accurate and complete planning and scheduling of the Work by the <br /> Contractor, both prior to the start of, and throughout, construction, is vital to the <br /> success of this Project for both the Contractor and the City. The purposes of the <br /> schedules and reports include: <br /> 1. Ensuring adequate planning and execution of the Work by the Contractor. <br /> 2. Assisting the City or its representative in monitoring construction. <br /> 3. Assessing the impact of any actual, potential or proposed change, including, <br /> but not limited to, the financial impact resulting from schedule changes and <br /> changes to the scope of Work. <br /> 4. Supporting the basis for construction payments. <br /> 5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. U <br /> All schedules will be reviewed by the City and the City's Representative. The City or <br /> City's Representative's review of any schedule shall not transfer the Contractor's <br /> responsibilities to the City. Review shall not constitute approval or acceptance of the <br /> Contractor's construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. <br /> Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractor's. The City or <br /> City's Representative may, however, comment upon the schedule. The Contractor <br /> remains wholly responsible for completing the Work within the Contract duration. Any <br /> comments by City or City's Representative personnel regarding the schedule shall not <br /> be construed as approval or ratification, nor shall the Contractor incorporate or change <br /> its schedule as a result of City or City's Representative comments in the absence of an <br /> express written directive to that effect. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP—114 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.