My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall submit, update and maintain schedules as required bythe Contract <br /> P <br /> Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the <br /> interim milestones, Substantial Completion, Physical Completion and Completion <br /> Dates provided by the Contract Documents. The City allocates its resources to a <br /> Contract based on the total time allowed in the Contract. The Contractor may submit a <br /> schedule indicating Completion Date earlier than the end of Contract Time, but City <br /> cannot guarantee its resources will be available to meet such schedule. City shall not <br /> pay or be liable for any additional compensation if the Contractor is not able to meet a <br /> schedule that indicates a Completion Date earlier than the end of Contract Time. <br /> Failure to schedule City furnished or installed materials and Equipment for installation <br /> on or after its planned arrival pursuant to the City's Contract with the supplier or failure <br /> to notify the City in writing of tasks dependent upon the fact or date of arrival of such <br /> City furnished materials and Equipment, constitute a waiver by Contractor of any <br /> +� Contract Claim arising out of or related to the timeliness of the furnishing or installation <br /> of such material and Equipment. All schedules shall allow for timely incorporation of <br /> any other's work under separate contract with City and for timely incorporation of any <br /> work provided and installed by City. Unless otherwise expressly authorized in writing <br /> by the City's Representative, the Contractor shall integrate the schedules with the <br /> Schedule of Values and unit price items so that each construction activity is <br /> represented by a dollar value. <br /> Float in a progress schedule belongs to the City. <br /> Subcontractors shall review all schedules prior to submission to the City and City's <br /> Representative. At the City's option and sole discretion, City may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and <br /> feasible, as the schedule relates to Subcontractors' work. <br /> Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly <br /> short duration. Contractor shall use its best efforts in good faith to set reasonable <br /> durations for all activities. Contractor shall not attempt to "grab the Float" or make an <br /> effort to use Float in the Progress Schedule for the benefit of the Contractor, rather <br /> than the benefit of the Project. Contractor shall use its best efforts in good faith to <br /> minimize dependencies, minimize the number of critical paths, and schedule the <br /> Project to be complete as expeditiously as reasonably possible. <br /> Contractor shall submit with each application for payment or progress pay estimate an <br /> updated progress schedule, but no less often than monthly. If requested by the City's <br /> Representative or the City, Contractor shall prepare and submit updated progress <br /> schedules from time to time that may be more frequent than monthly. <br /> The Contractor hereby expressly agrees and acknowledges that any failure by <br /> Contractor to provide accurate, complete, current and updated schedules at least <br /> monthly constitutes a waiver of any and all claims or requests for adjustment of <br /> Contract Sum or Time that arise out of, result from, or are caused by, any Delay on the <br /> Project or scheduling of the Work. Timely submission of updated schedules at least <br /> monthly is a condition precedent to any later or subsequent Contract Claim or request <br /> for an adjustment of either Contract Sum or Time related to or arising out of time, an <br /> alleged Delay, or the schedule or sequence of Work. Similarly, the parties agree the <br /> City may withhold progress pay estimates if updated schedules are not timely <br /> submitted monthly. These remedies are cumulative and not exclusive of other remedy. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP- 115 <br /> I <br />