My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> timely and proper manner, one or more Contract obligations, or is in violation of <br /> any provisions or covenants of the Contract. Termination shall be effective upon <br /> Contractor's and Surety's receipt of such notice <br /> For purposes of this section, the Contractor shall be deemed to be in default upon <br /> the occurrence of one or more of the following events: <br /> 1. If Contractor is bankrupt or insolvent. <br /> 2. If Contractor makes a general assignment for the benefit of creditors. <br /> ' 3. If a trustee or receiver is appointed for Contractor, or for any of <br /> Contractor's property. <br /> 4. If Contractor files a petition to take advantage of any debtor's law, or to <br /> reorganize under any bankruptcy chapter or law. <br /> 5. If Contractor repeatedly fails to make prompt payments to subcontractors <br /> or others for labor, materials, or Equipment. <br /> 6. If Contractor disregards laws, ordinances, rules, regulations, or orders of <br /> public bodies having jurisdiction. <br /> 7. If Contractor disregards the authority of the City or City's Representative. <br /> 8. If Contractor substantially violates the provisions of the Contract <br /> Documents or fails, neglects, or refuses to proceed in compliance with <br /> the provisions of the Contract Documents. <br /> 9. If the Contractor made material misrepresentations to the City with <br /> respect to: (a) its qualifications or those of its subcontractors; (b) its or its <br /> subcontractors' ability to perform the Work in a timely, workmanlike <br /> manner; (c) the materials installed or to be installed; or (d) progress pay <br /> estimates. <br /> After termination of the Contractor for default, the City may transfer performance <br /> of the Work to the Contractor's Surety or elect to prosecute to completion by <br /> contract or otherwise. <br /> If the City chooses to provide such sufficiency of labor or materials as required to <br /> complete the Work, the City may exclude the Contractor from the site and take <br /> possession of the Work and all of the Contractor's tools, appliances, owned or <br /> rented construction equipment, and machinery at the site and use the same to the <br /> full extent they could be used by the Contractor. The City may incorporate in the <br /> Work all materials and Equipment stored at the site or for which the City has paid <br /> the Contractor, but which are not yet on site. In such case, the Contractor will not <br /> be entitled to receive any further payment until the Work is finished. At the City's <br /> sole option, Contractor shall assign and transfer any contractual rights to material <br /> and Equipment to be installed, incorporated, or used in the performance of the <br /> Work. City shall credit Contractor for the reasonable fair market rental value of <br /> any and all Contractor owned equipment for so long as retained and used by the <br /> City. City shall credit Contractor for all materials and supplies on site or on order, <br /> but not yet paid for by City, provided that ownership is transferred and assigned to <br /> the City and the materials and supplies conform to the requirements of the <br /> Contract Documents. <br /> 1 If the unpaid balance of the Contract Sum exceeds the direct and indirect cost of <br /> the completed Work, including construction management services, such excess <br /> shall be paid to the Contractor. If such costs exceed such unpaid balance, the <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-127 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.