My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall pay the difference to the City. Such costs incurred by the City will <br /> be verified by the City's Representative and incorporated into a Change Order, but <br /> in finishing the Work, the City may negotiate for materials, Equipment and <br /> services to complete the Work and will not be required to obtain the lowest figure <br /> for Work performed. <br /> Where the Contractor services have been so terminated by the City, the , <br /> termination shall not affect rights of the City against the Contractor then existing or <br /> which may thereafter accrue. Any retention or payment of monies due the <br /> Contractor by the City will not release the Contractor from liability. , <br /> If the City terminates this agreement for default, and it is thereafter determined <br /> that the Contractor had not so failed to perform its obligations or defaulted in any <br /> way, the termination shall then be deemed to have been made for the I <br /> convenience of the City pursuant to 1-08.10(2) TERMINATION FOR PUBLIC <br /> CONVENIENCE. In that event, any adjustment of Contract Sum shall be in <br /> accordance with the Contract Documents. <br /> 111 <br /> The Contractor covenants and agrees that in the event suit is instituted by the City <br /> for any default on the part of the Contractor and the Contractor is adjudged by <br /> court of competent jurisdiction to be in default, the Contractor shall pay to the City <br /> all costs, expenses expended or incurred by the City in connection therewith. <br /> 1-08.10(2) Termination for Public Convenience <br /> Delete all of 1-08.10(2) and substitute the following: ' <br /> Without prejudice to any other remedy it may have under law or the provisions of <br /> the Contract, or both, the City may terminate this Contract for convenience, with or <br /> without cause, in whole or in part, at any time by giving written Notice to the <br /> Contractor. Termination will be effective upon receipt of such Notice by the <br /> Contractor. The Contractor shall immediately discontinue work and take all <br /> reasonable steps with its suppliers and subcontractors to minimize cancellation <br /> charges and other costs. <br /> In the event of termination for convenience, the Contractor shall be compensated <br /> as provided in 1-09.5 DELETED OR TERMINATED WORK. The Contractor will be <br /> entitled to no further payments whatsoever for the Work. <br /> In the event of a breach or default by the Contractor, City may, at its sole option, <br /> terminate this Contract in whole or in part for convenience as provided herein. <br /> The City may pursue any and all contractual, legal and equitable remedies for <br /> such breach or default. Absent an express written agreement to the contrary, a <br /> termination for the City's convenience shall not be deemed a waiver or release of <br /> any rights by the City nor shall the City be estopped from any legal or equitable <br /> remedies that may be appropriate. <br /> Supplement 1-08.10 by adding the following: <br /> 1-08.10(6) Termination by Contractor after Suspension <br /> If the Work has been wholly suspended pursuant to 1-08.6 SUSPENSION OF WORK111 <br /> for more than ninety (90) calendar days as measured from the date of the Notice to <br /> suspend, then the Contractor may terminate this Contract by providing City with <br /> fourteen (14) calendar days' Notice that the Contractor shall deem the Contract to be <br /> terminated if the City does not provide Contractor with notice to resume Work within <br /> those fourteen (14) calendar days. Such termination shall be treated as a termination <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP - 128 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.