My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall not submit a Contract Claim for possession by the City of portions of <br /> the Work specifically required in the Contract Documents to be placed into use or <br /> operation or both before completion of the entirety of the Work. <br /> 1-08.10(12) Possession of Incomplete Portions of the Project <br /> (******) <br /> Should the Contractor fail to meet any date specified for Substantial Completion or <br /> Physical Completion of Work or any portion of Work requiring early possession and <br /> use by the City, the City may, after a 14 calendar day Notice to the Contractor, take <br /> over such portion or any Work that is behind schedule. In such case, the City's <br /> Representative will prepare a list of incomplete Work taken over by the City. The cost <br /> of City's work will be charged to and deducted from amounts due to the Contractor. <br /> The Substantial Completion date of the entire or a portion of the Project will be I <br /> established as the date when the City actually begins using the Project or portion of <br /> the Project for its intended purpose. Division of responsibilities between City and <br /> Contractor, beginning of warranties, and any other issues relating to Substantial <br /> Completion shall be as specified in 1-08.5(2) SUBSTANTIAL COMPLETION. <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.11 Record Drawings ,t <br /> (******) <br /> 1-08.11(1) Description <br /> This section specifies the requirements for preparing record drawings. The Contractor, <br /> with the cooperation and assistance of the City Inspector, is responsible for marking up <br /> record drawings during the course of construction. The Contractor shall keep the <br /> record drawings up to date at all times during the course of construction. <br /> The Contractor shall notify the City in writing when the updated progress schedule as <br /> defined in Special Provision 1-08.3(2) shows the total percentage of Work completed <br /> to be 25%, 50%, and 75% and submit record drawing markups for all work completed. <br /> Payment of the first progress report following each notice will be contingent on the <br /> acceptance of the Contractor's record drawing markups. If the record drawings are not <br /> current or accurate, the payment will not be processed. <br /> As the Contract approaches Final Acceptance, prepare, with the assistance of the <br /> Inspector, a complete and accurate set of record drawings. The Inspector must <br /> approve the record drawings prior to Final Acceptance. Final Acceptance will not be <br /> issued until the City accepts the record drawings. <br /> 1-08.11(2) Recording Changes <br /> As a minimum, record the following items on the record drawings: <br /> a. Actual dimensions, arrangement and materials used when different than <br /> shown on the Plans. <br /> b. Changes made by Change Order or Field Order. <br /> c. Changes made by the Contractor. <br /> d. Horizontal and vertical locations of underground utilities and appurtenances, <br /> shall be referenced to monumentation. The monumentation shall be based <br /> on NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br /> e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br /> elevations. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> 111 <br /> WO No.— UP3470-10 Division 1 — GENERAL REQUIREMENTS April 2016 <br /> SP -130 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.