My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> delivered to the City'sInspectordelivery at time of of materials. Tickets not received <br /> by the City's Inspector on day of delivery will not be honored for payment. <br /> 1-09.3 Scope of Payment i <br /> Supplement 1-09.3 by adding the following: <br /> 1-09.3(1) Schedule of Values <br /> (******) <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br /> in part, then the Schedule of Values for that portion of the Work shall also be based on <br /> unit prices. If the Proposal Form calls for a lump sum price, in whole or in part, then <br /> the Schedule of Values shall: reasonably allocate the Contract Sum among the various <br /> portions of the Work; be complete; be organized to include detailed breakdown of each <br /> major unit of the Work; be organized to correspond to Contractor's schedule; break <br /> down the Contract Sum showing the value assigned to each part of the Work; include <br /> an allowance for profit and Overhead; include Unit Price Work, if and to the extent <br /> indicated on the Proposal Form; be so organized as to facilitate assessment of Work <br /> and payment of Subcontractors; and be balanced. To the greatest extent possible, the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor111 <br /> shall provide documentation substantiating the cost allocation if asked by the City's <br /> Representative. Upon acceptance of the Schedule of Values by the City's <br /> Representative, it shall be used as a basis for all requests for payment. <br /> 1-09.4 Equitable Adjustment <br /> Supplement 1-09.4 by adding the following: <br /> Other means to establish the reasonable cost of the Work not defined by unit prices <br /> include, but is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br /> estimating manuals. <br /> 1-09.4(1) General <br /> (******) <br /> The following shall apply in determining the amount of an equitable adjustment of <br /> Contract Sum: <br /> 1. Except as otherwise expressly provided, Contractor will only be paid for costs <br /> it clearly and convincingly proves it actually and directly incurred, and shall 111not include consequential or indirect damages not otherwise expressly <br /> permitted by the Contract Documents. Costs and damages for which the <br /> City shall not be liable under any circumstances include, but are not limited <br /> to: (a) borrowing or interest costs, charges, or expenses of Contractor; (b) <br /> alleged lost profit or overhead on any other project; and (c) Contractor's <br /> failure or inability to obtain other work. <br /> 2. No Contract Claim for adjustment of Contract Sum or additional I <br /> compensation for extra, affected, impacted or inefficient work will be allowed <br /> where the Contractor does not keep and maintain contemporaneous, <br /> complete and accurate time records for labor and equipment and <br /> contemporaneous, complete and accurate records for materials and where <br /> such records do not contemporaneously segregate and allocate by time, <br /> location and Work the time and costs for each item or element of such Work. <br /> 111 <br /> Contractor's failure to keep and maintain such records constitutes a waiver of <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP - 132 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.