My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> NT <br /> 1-10 TEMPORARY TRAFFIC CO ROL <br /> 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the <br /> ' following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> ' 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> ' Contractor may use City's Standard Traffic Control Plans included in COE <br /> Standard Drawings, Series 700. The City does not represent or warrant that the <br /> Standard Plans are sufficient, adequate or complete for the Contractor's means, <br /> ' methods or plan of Work. If a new or additional Traffic Control Plan is necessary, <br /> prepare detailed Traffic Control Plan complying with COE Standard Drawings, <br /> Series 700, the MUTCD, Part 6, and the most current edition of the PROWAG <br /> (Public Rights-of-Way Accessibility Guidelines). Plan preparation shall be at <br /> Contractor's sole cost and submitted to the City for approval at least 14 calendar <br /> days before starting Work. Work may not begin until Contractor is in receipt of <br /> City approved Traffic Control Plan. <br /> 1 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> ' 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1-10.3(1) General <br /> ' The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> ' from injury or damage as a result of the Contractor's operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. <br /> 1-10.3(2) Maintenance and Protection of Traffic Control <br /> When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br /> Control", the Work required for this item shall be to: <br /> ' 1. Furnish and maintain signs, cones, barricades, flasher, and other <br /> channelization devices; <br /> Provide supervisory personnel for all labor for traffic control;12. <br /> 3. Provide labor and necessary vehicle(s) for set-up and removal of construction <br /> signs and the traffic control devices that are placed daily; <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.—UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP —151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.