My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. Provide labor and vehicles for patrolling and maintaining in position all of the <br /> construction signs and the traffic control devices; <br /> 5. Provide labor, material, and equipment necessary for flagging, cleaning up, <br /> removing and replacing all construction signs and traffic control devices that <br /> are destroyed, damaged or lost during the life of the project; 1116. Provide flagging or use of police officers for the convenience of the <br /> Contractor, such as facilitating movement of equipment on the site, laying out <br /> or relocating traffic control devices and signs. <br /> Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> remove signs; or provide, erect, maintain, and remove other traffic control devices <br /> when ordered to do so by the Engineer, the City may without further notice to the <br /> Contractor or the Surety, perform any of the above and deduct all or the costs from the <br /> Contractor's payments. <br /> The Contractor shall be responsible for providing adequate flaggers, signs, and other <br /> traffic control devices for the protection of the worker and the public at all times <br /> regardless of whether or not the flaggers, signs, and other traffic control devices are <br /> ordered by the Engineer, or paid for by the City. The Contractor shall be liable for <br /> injuries and damages to persons and property suffered by reason of the Contractor's <br /> operations or negligence in connection therewith. <br /> 1-10.3(3) No Passing Zones <br /> The striping of no passing zones that are to be obliterated in excess of 150-feet by <br /> paving operations shall be replaced by "Do Not Pass" and "Pass With Care" signs. <br /> The signs shall be located not less than 2-feet outside the usable shoulder nor less <br /> than 7-feet above the edge of pavement. The number of necessary signs will be <br /> specified in the Special Provisions. <br /> The Contractor shall provide and install the signs and sign posts. The signs shall be <br /> maintained by the Contractor until construction operations are complete. When the <br /> project includes striping by the Contractor, the signs and posts shall be removed by the <br /> Contractor when the no passing zones are re-established by striping. <br /> When the Contractor is not responsible for striping, the signs and posts shall be , <br /> removed by the Contractor when the "No Passing Zones" are re-established by <br /> striping. Payment to perform the Work required for this subsection will be under the <br /> item "Maintenance and Protection of Traffic Control". ' <br /> 1-10.3(4) Traffic Control Labor <br /> The Contractor shall furnish all personnel for flagging to control traffic during <br /> construction operations. Flaggers shall have a current certification (Flagging Card) <br /> from the State Department of Labor and Industries (WAC 296-155-305). Employees of <br /> the Contractor engaged in flagging or traffic control shall wear reflective vests and hard <br /> hats. During hours of darkness, white coveralls or white or yellow rain gear shall also , <br /> be worn. The vests and other apparel shall be in conformance with Section 1-07.8. <br /> The Contractor shall furnish the MUTCD standard Stop/Slow paddles, except the <br /> minimum width shall be 24-inches, for the flagging operations. During hours of <br /> darkness flagger stations shall be illuminated to insure that flaggers can be easily seen <br /> without causing glare to the traveling public. The Contractor shall develop and use a <br /> method to ensure that flaggers have adequate warning of objects approaching from <br /> behind the flagger. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.