Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> tDIVISION 2 — EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> 2-01.2 Disposal of Usable Material and Debris <br /> Supplement 2-01.2 by adding the following: <br /> ' When requested by the property owner, trim trees of sufficient size for fire wood, cut <br /> into two-foot rounds and neatly stack on adjacent property. Remove and dispose of <br /> stumps, large roots, limbs and branches. <br /> ' 2-01.2(1) Disposal Method No.1 - Open Burning <br /> Delete 2-01.2(1). <br /> ' 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> ' described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> ' Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br /> be included with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> ' Delete 2-02.1 and substitute the following: <br /> The Work shall consist of the removal, disposal or abandoning in-place of various <br /> existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> ' curb and gutter, gutter, valves, manholes, catch basins, trees, and other items <br /> necessary for the accomplishment of the improvement. <br /> All Work with asbestos-cement pipe shall conform to the "Recommended Standard <br /> Asbestos-Cement Pipe Work Practice Procedure and Training Requirements," latest <br /> edition, as published by the American Water Works Association, Pacific Northwest <br /> Section. Remove and dispose of Asbestos-Cement pipe in accordance with the <br /> ' practices specified by the State of Washington Department of Ecology and the <br /> Snohomish County Solid Waste Division. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with <br /> the construction, properly plug all pipe openings abandoned in-place watertight <br /> with Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> ' Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> ' Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 2-EARTHWORK April 2016 <br /> ' SP - 157 <br />