My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS ' <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, ' <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra <br /> Work under 1-04.4. <br /> 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> Delete 2-02.3(3) and substitute the following: <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> (******) <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing <br /> improvements including, but not limited to, pavements, curb, curb and gutter, <br /> gutter and other items necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement <br /> Remove full depth existing permanent type pavement and driveway pavement <br /> shown on the Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is <br /> damaged during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting <br /> Make vertical full depth saw cut between existing asphalt concrete pavement, <br /> to remain and the portion to be removed. <br /> Where asphalt concrete pavement overlays cement concrete pavement base, <br /> saw cut in accordance with 2-02.3(6) Sawing and Line Drilling. <br /> 2-02.3(3)C Removal of Curb, Curb and Gutter <br /> Remove existing curbs where shown on the Plans or where encountered in the <br /> Work and designated by the Engineer. <br /> Existing curb and gutter includes, but is not limited to, cement concrete, cement <br /> concrete curb with a brick gutter and a cement concrete back, or other <br /> combinations of rigid materials. Remove the entire curb and gutter section, <br /> regardless of material composition. <br /> 2-02.3(3)C1 Sawcutting <br /> Make vertical full depth saw cut between existing curb or curb and gutter to <br /> remain and the portion to be removed. <br /> 2-02.3(3)D Removal of Cement Concrete Sidewalks <br /> Concrete slabs that average four-inches or less in thickness will be considered as <br /> sidewalk removal. <br /> Protect existing concrete walk that is to remain in place, from equipment damage ' <br /> by using planking or cover with rock free eight-inch thick blanket of excavated soil. <br /> Provide Engineer with proposed pavement breakers before use and do not begin <br /> breaking pavement without Engineer's approval of the pavement breakers. <br /> 2-02.3(3)D1 Sawcutting <br /> Make vertical full depth saw cut between existing cement concrete sidewalk <br /> to remain and the portion to be removed at the nearest scribe marks beyond <br /> the neat line limits, or to the nearest joint. <br /> No diagonal cuts in sidewalk will be allowed unless otherwise indicated on the <br /> Plans or directed by the Engineer. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 2—EARTHWORK April 2016 <br /> SP - 158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.