My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide temporary drainage to keep the subgrade free from standing water. <br /> Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br /> than 2-1/2 inches in greatest dimension. <br /> ' Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br /> elevations shown. Take care not to excavate below the specified grades. Maintain all <br /> excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br /> trash, and other debris. <br /> 2-03.3(2) Rock Cuts <br /> Delete entire subsection "Controlled Blasting." <br /> 2-03.3(3) Excavation Below Subgrade <br /> Supplement 2-03.3(3) by adding the following: <br /> Proof Rolling. Proof roll subgrade under the roadway with a fully loaded tandem <br /> truck following trench backfilling and grading to subgrade to identify soft or loose <br /> areas in the subgrade . in areas where the subgrade does not stand up to the <br /> proof roll, over excavate the subgrade and replace with imported Foundation <br /> Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br /> the subgrade up to the proper compaction and grade. Compact backfill material in <br /> accordance with 2-03.3(3). <br /> 2-03.3(7) Disposal of Surplus Material <br /> 2-03.3(7)C Contractor-Provided Disposal Site <br /> Delete the first paragraph of 2-03.3(7)C and substitute the following: <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> Dispose of Asbestos-cement pipe in accordance with the requirements of the <br /> State of Washington Department of Ecology and the Snohomish County Solid <br /> Waste Division. <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division D - Bid Items Descriptions and provided in Section 1-09 <br /> ' MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 2- EARTHWORK April 2016 <br /> SP - 161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.