CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide temporary drainage to keep the subgrade free from standing water. <br /> Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br /> than 2-1/2 inches in greatest dimension. <br /> ' Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br /> elevations shown. Take care not to excavate below the specified grades. Maintain all <br /> excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br /> trash, and other debris. <br /> 2-03.3(2) Rock Cuts <br /> Delete entire subsection "Controlled Blasting." <br /> 2-03.3(3) Excavation Below Subgrade <br /> Supplement 2-03.3(3) by adding the following: <br /> Proof Rolling. Proof roll subgrade under the roadway with a fully loaded tandem <br /> truck following trench backfilling and grading to subgrade to identify soft or loose <br /> areas in the subgrade . in areas where the subgrade does not stand up to the <br /> proof roll, over excavate the subgrade and replace with imported Foundation <br /> Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br /> the subgrade up to the proper compaction and grade. Compact backfill material in <br /> accordance with 2-03.3(3). <br /> 2-03.3(7) Disposal of Surplus Material <br /> 2-03.3(7)C Contractor-Provided Disposal Site <br /> Delete the first paragraph of 2-03.3(7)C and substitute the following: <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> Dispose of Asbestos-cement pipe in accordance with the requirements of the <br /> State of Washington Department of Ecology and the Snohomish County Solid <br /> Waste Division. <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division D - Bid Items Descriptions and provided in Section 1-09 <br /> ' MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 2- EARTHWORK April 2016 <br /> SP - 161 <br />