My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> 2-02.3(11) Abandonment of Catch Basins, Manholes, Inlets or Sumps , <br /> Excavate and remove the structure to four feet below final grade including, but not <br /> limited to, casting and outlet trap, concrete encasement and bricks, as applicable to <br /> each removal item listed in the Proposal. <br /> Plug existing connecting pipes that remain as specified in 7-08.3(4). Backfill shall be <br /> Gravel Borrow as specified in 9-03.14(1). Compact backfill to a minimum of 95 percent <br /> maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Measurement <br /> Delete the first paragraph of 2-02.4 and substitute the following: <br /> Work under this Section shall be covered as incidental to other bid items, and no <br /> additional compensation will be provided. <br /> 2-02.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Work under this Section shall be covered as incidental to other bid items, and no I <br /> additional compensation will be provided. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br /> pavement patching shall conform to COE Standard Drawing No. 316, unless otherwise <br /> noted on the Plans. <br /> 2-03.2 Vacant <br /> Delete 2-03.2 and substitute the following: , <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> Supplement 2-03.3 by adding the following: <br /> Blasting is not allowed within the City limits of Everett. <br /> Use suitable excavated material for roadway embankments. Dispose of surplus <br /> excavated material or unsuitable material in accordance with 2-03.3(7). <br /> Engineer will not approve payment for unauthorized excavation or embankment, or <br /> both, beyond the limits indicated on the Plans. Return areas of unauthorized <br /> excavation or embankment, or both, to their original conditions or better at the <br /> Contractor's expense. <br /> Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br /> Final grading shall produce a uniform surface within established tolerances and without <br /> abrupt changes in grade. <br /> Construction requirements for pavement patching authorized by Engineer outside of <br /> Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br /> No. 316 for existing asphalt concrete over prepared grade. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 2—EARTHWORK April 2016 <br /> SP - 160 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.