CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. Notify City water utility immediately upon completing the use of the hydrants <br /> so the hydrants may be inspected for possible damage. City water utility will <br /> repair damage resulting from the use of the hydrants by the Contractor. <br /> ' Contractor shall be responsible for repair cost and cost, if necessary, shall be <br /> withheld from the final payment to the Contractor. <br /> 6. City water utility will fine Contractor for violation of these requirements. <br /> Contractor shall also be liable for damage suits resulting from malfunctioning <br /> of Contractor damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-08 VACANT <br /> Revise 2-08 to read as follows: <br /> 2.08 STREET CLEANING <br /> (******) <br /> 2-08.1 Description <br /> This Work shall consist of cleaning pavement and removing debris from roadways within <br /> the Project limits and Contractor haul routes. Sweep streets and roadways as needed at <br /> least once per day. Thoroughly clean and sweep all roadway areas subject to construction <br /> traffic within the Project area and connecting streets at the end of the workday and as <br /> needed during the workday when necessary or directed by the City. More frequent <br /> cleaning may be required, as directed by the City's Inspector, as conditions warrant. <br /> Spills shall be cleaned up immediately. Failure to clean streets or spills as required will <br /> result in City procuring street cleaning services, or cleaning streets themselves at City <br /> overtime rates. Either way, Contractor shall be responsible for reimbursing the City for cost <br /> incurred. If Contractor fails to promptly reimburse City then City will deduct cost, plus <br /> interest on unpaid balance, from Contractor's final payment. <br /> 2-08.2 Vacant <br /> 111 2-08.3 Construction Requirements <br /> Provide self-propelled broom-type pickup sweepers equipped with water spray systems for <br /> dust control for pavement cleaning and debris removal as required. Additional <br /> supplementary water to suppress dust during sweeping shall be applied with a water truck <br /> when necessary unless otherwise directed by the City Inspector. <br /> The type and number of sweepers are subject to the approval of the Engineer. <br /> Plan construction operations to minimize the need for street cleaning. <br /> 2-08.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division D - Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. Street Cleaning will be <br /> ' based on based on a 3-hour minimum per day. <br /> 2-08.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division D - Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09 STRUCTURE EXCAVATION <br /> 2-09.2 Materials <br /> Supplement 2-09.2 by adding the following at end of the materials list: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division 2- EARTHWORK April 2016 <br /> SP - 163 <br />