Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS I <br /> 2-09.3 Construction Requirements I <br /> 2-09.3(1) General Requirements <br /> 2-09.3(1)C Removal of Unstable Base Material <br /> Delete all paragraphs in 2-09.3(1)C and substitute the following: <br /> When the material at the bottom of an excavation is not stable enough to <br /> support the Structure, the Contractor shall excavate below grade to the depth <br /> required by the Engineer and replace the unstable material with Foundation <br /> Material Class A or B. <br /> Place Foundation Material Class A or B in layers not more than six inches <br /> thick and compact to minimum of 90-percent maximum density as determined <br /> by 2-03.3(14)D. <br /> Dispose of unsuitable material removed to make room for foundation material <br /> by hauling to a waste site obtained and provided by the Contractor in 111 <br /> accordance with 2-03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material I <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> All costs for disposing of excavated material, whether within the Project limits <br /> or hauled to a disposal site, shall be incidental to the other Bid items in the <br /> Proposal. The City will not pay for hauling. Disposal of excavated material <br /> shall meet the requirements of 2-03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with <br /> consistency having approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. <br /> Use wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, <br /> gravel borrow, washed sand or crushed surfacing top course, the respective <br /> limits for trench width or backfill dimensions shall be approved by the <br /> Inspector. <br /> 2-09.4 Measurement <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09.5 Payment ' <br /> Delete all paragraphs in 2-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Structure Excavation" in the Proposal, all Work in this <br /> section shall be included with the respective Bid Items of the Contract with no direct <br /> compensation made. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 2-EARTHWORK April 2016 <br /> SP - 164 1 <br />