My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-11 TRIMMING AND CLEANUP <br /> 2-11.3 Construction Requirements <br /> Supplement 2-11.3 by adding the following after item 6: <br /> 7. Keep City streets clean and free from mud, dirt and other debris. <br /> Further supplement 2-11.3 by adding the following: <br /> Keep the Project site in a neat and orderly condition during the process of construction <br /> with as little disruption to the adjoining properties as practical under the conditions. <br /> Promptly and as often as needed cleanup debris resulting from Contractor's operations <br /> from drainage facilities such as inlets, catch basins, culverts and open ditches. <br /> Remove and dispose of all construction stakes. <br /> Upon Project completion, clean Project area and neatly dress slopes to present a <br /> uniform appearance blending into the contour of adjacent properties. Remove trash of <br /> all kinds resulting from construction operations. <br /> 2-11.4 Measurement <br /> Delete all paragraphs in 2-11.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-11.5 Payment <br /> Delete all paragraphs in 2-11.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division D - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Trimming and Cleanup" in the Proposal, all Work in this <br /> section shall be included with other Work with no direct compensation made. <br /> I <br /> 111 I <br /> I <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No. - UP3470-10 Division 2-EARTHWORK April 2016 <br /> SP -165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.