My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 CITY OF EVERETT SPECIAL PROVISIONS <br /> r� CITY OF EVERETT, WASHINGTON <br /> BID ITEMS FOR <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS <br /> SEWER"M" PHASE II <br /> WO No. UP3470-10 <br /> BID ITEM A-1 & B-1: SURVEYING <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid for surveying includes all costs associated with furnishing all labor, tools, <br /> survey instruments materials, and other equipment necessary for setting and monitoring <br /> location, elevation, alignment and grade of the work as specified in Section 1-05.4 of the <br /> Standard Specifications and these Special Provisions and the Drawings. <br /> The lump sum bid item also includes full compensation for furnishing all labor, tools, survey <br /> instruments, materials and other equipment necessary for verifying the rim and invert <br /> elevations, prior to construction, of all existing sewerage and storm drains and appurtenances <br /> where connections are to be made. <br /> The lump sum also includes full compensation for furnishing all labor, tools, survey instruments, <br /> materials and other equipment necessary for obtaining the "as constructed" location and <br /> elevations of the Contract work, in particular, sewer pipe invert elevations and other information <br /> necessary for production of the Record Drawing (As-Constructed) documents meeting the <br /> requirements defined in Section 1-08.11 of these Special Provisions. <br /> Measurement for surveying shall be the ratio of actual pipe installed and backfilled to the total <br /> quantity of pipe listed in the proposal. <br /> BID ITEM A-2 & B-2: CONTRACTOR'S LIAISON <br /> Measurement and Payment: Lump Sum <br /> This lump sum bid item includes full compensation for providing an employee dedicated full-time <br /> as a Community Project Liaison to coordinate access and other needs of business owners and <br /> residents within the area affected by the project. Specific requirements are identified in Section <br /> 1-07.29. <br /> Measurement for Contractor's Liaison shall be the ratio of the number of working days <br /> completed to the total number of working days authorized in the Contract. <br /> i <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.—UP3470-10 Division D—BID ITEM DESCRIPTIONS April 2016 <br /> SP -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.