My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> BID ITEM A-22 & B-20: CEMENT CONCRETE PAVEMENT I <br /> Measurement and Payment: Unit Price per Cubic Yard <br /> The unit Contract price per cubic yard shall be full payment for all costs to complete the Work <br /> for removal and disposal of the existing concrete off of the Contracting Agency's Right of Way, <br /> preparing the surfacing or subgrade below the new concrete, furnishing and placing the cement <br /> concrete, and for all incidentals required to complete the Work as specified in the Construction <br /> Documents and per Section 5-05. <br /> Also included in the unit price for this bid item, with no direct compensation made, is adjusting <br /> existing features including but not limited to valve boxes, manhole covers, catch basin grates, <br /> and other features to match finish pavement grade. <br /> Gravel Borrow placed below cement concrete will be measured and paid for separately in 1 <br /> accordance with other applicable Contract bid items. <br /> Measurement for cement concrete pavement will be by the cubic yard, based on the actual I <br /> width, length, and depth of the concrete placed. <br /> BID ITEM B-21: STORM DRAIN PIPE, 8 IN. DIA. 111 <br /> BID ITEM B-22: STORM DRAIN PIPE, 12 IN. DIA. <br /> BID ITEM B-23: STORM DRAIN PIPE, 15 IN. DIA. I <br /> BID ITEM B-24: STORM DRAIN PIPE, 18 IN. DIA. 1 <br /> BID ITEM B-25: STORM DRAIN PIPE, 21 IN. DIA. <br /> BID ITEM B-26: STORM DRAIN PIPE, 24 IN. DIA. I <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per linear foot bid for the type and size of storm drain pipe shall be full , <br /> compensation for all labor, material, incidentals, tools and equipment necessary to satisfactorily <br /> complete the work as defined in these Contract Documents. <br /> The unit price per linear foot of storm drain pipe shall be full compensation for furnishing, <br /> hauling, and assembling in place the completed installation, including all wyes, tees, special <br /> fittings, joint materials and adjustment of inverts to inlets, connections to catch basins and I <br /> manholes or combined sewer main for the completion of the installation to the required lines and <br /> grades. <br /> The unit price of storm drainage pipe shall also include, but not be limited to; all costs for trench 1 <br /> excavation; hauling and disposing of surplus material; dewatering; storm flow bypassing; <br /> furnishing, stockpiling, hauling, placing and compacting suitable native backfill; cleaning and <br /> flushing pipes and existing structures; testing and inspecting pipe; pipe separation pads per <br /> section 7-08.3(2)J; connecting pipe existing structures; reconnecting existing storm drains; and <br /> replacing, protecting, and maintaining utilities. <br /> All costs associated with abandoning existing storm drainage pipe as indicated on the plans <br /> including plugging and/or removal and disposal shall be included in the unit price for this bid <br /> item. 11 <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.ā UP3470-10 Division Dā BID ITEM DESCRIPTIONS April 2016 <br /> SP -40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.