Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> BID ITEM B-32: CATCH BASIN ADDITIONAL HEIGHT 48 IN. DIA. TYPE 21 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> In addition to the measurement per each, catch basin type 2 in excess of 10 feet in height will t <br /> be measured per linear foot for each additional foot of total height over 10 feet as measured <br /> from the flow line to the surface of the Work. <br /> The unit price per linear foot shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in these Contract <br /> Documents. I <br /> Measurement of catch basin height for payment purposes shall be the distance from the flowline <br /> of the outlet pipe to the surface of the Work measured to the nearest foot. , <br /> BID ITEM A-23: MANHOLE, 48 IN. DIA. TYPE 1 <br /> BID ITEM B-33: MANHOLE, 48 IN DIA. TYPE 3 1 <br /> BID ITEM A-24: MANHOLE, 54 IN. DIA. TYPE 1 <br /> BID ITEM B-34: MANHOLE, 54 IN. DIA. TYPE 3 1 <br /> BID ITEM A-25: MANHOLE, 60 IN. DIA. TYPE 1 <br /> BID ITEM A-26: MANHOLE, 72 IN. DIA. TYPE 3 1 <br /> BID ITEM A-27: MANHOLE, 84 IN. DIA. TYPE 3 <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each manhole shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract <br /> Documents. <br /> The unit price for each manhole shall be full compensation for furnishing, hauling, and <br /> assembling in place the completed installation including all manholes, frames and grates, pipe <br /> connections, special fittings, and joint materials up to a depth of 10-ft as measured from the <br /> from the flowline of the outlet pipe to the surface of the Work measured to the nearest foot. <br /> The unit price of per each manhole shall also include, but not be limited to, all costs for <br /> excavation; hauling and disposing of surplus or unsuitable material; dewatering; sewer flow I <br /> bypassing; furnishing and installing couplings furnishing and installing steps or ladder; placing <br /> and compacting native backfill; furnishing, placing, and compacting foundation material as <br /> required; cleaning and flushing manholes; reconnecting existing sanitary sewer connections; <br /> and replacing, protecting and maintaining utilities. <br /> All costs associated with abandoning and/or removing and disposing of existing manholes as <br /> shown on the plans shall be included in the unit price for this bid item. <br /> Adjusting new manhole rings and covers to final grade shall be included in the unit price for this <br /> bid item. <br /> Installation of field-formed concrete channels and benches inside all manhole bases shall be <br /> included in this bid item. Pre-cast or pre-formed channel bases are not acceptable. I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division D-BID ITEM DESCRIPTIONS April 2016 <br /> SP -42 <br />