My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The cost of connection of pipes to the manhole, except for drop connections, is incidental and <br /> shall be included in the unit price for this bid item. <br /> Measurement shall be per each manhole installed as measured upon completion. <br /> BID ITEM A-28: MANHOLE ADDITIONAL HEIGHT 48 IN. DIA. TYPE 1 <br /> BID ITEM B-35: MANHOLE ADDITIONAL HEIGHT 48 IN. DIA. TYPE 3 <br /> BID ITEM A-29: MANHOLE ADDITIONAL HEIGHT 54 IN. DIA. TYPE 1 <br /> BID ITEM A-30: MANHOLE ADDITIONAL HEIGHT 60 IN. DIA. TYPE 1 <br /> BID ITEM A-31: MANHOLE ADDITIONAL HEIGHT 72 IN. DIA. TYPE 3 <br /> BID ITEM A-32: MANHOLE ADDITIONAL HEIGHT 84 IN. DIA. TYPE 3 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> In addition to the measurement per each, manholes in excess of 10 feet in height as measured <br /> from the flow line to the surface of the Work will be measured per linear foot for each additional <br /> foot of height over 10 feet. <br /> ' The unit price per linear foot shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in these Contract <br /> Documents. <br /> ' Measurement of manhole height for payment purposes shall be the distance from the flowline of <br /> the outlet pipe to surface of the Work measured to the nearest foot. <br /> BID ITEM A-33: DROP MANHOLE CONNECTION <br /> Measurement and Payment: Unit Price per Each <br /> The Unit Price for each drop connection shall constitute full compensation for all labor, materials <br /> and equipment necessary for the construction of an outside drop connection at an existing or <br /> ' new manhole as defined in the Contract Documents. <br /> This pay item includes, but is not limited to, all excavation, dewatering, hauling, dewatering, <br /> core drilling, pipe, fittings, blocking, concrete encasement, and compacted backfill necessary to <br /> construct an outside drop per COE Standard Drawings 608 for one sewer pipe of the diameter <br /> indicated on the Plans. <br /> Measurement and payment will be on a Unit Price per Each. <br /> i <br /> t <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division D-BID ITEM DESCRIPTIONS April 2016 <br /> SP -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.