KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> BID ITEM A-38: HDPE PIPE FOR SANITARY SEWER FORCE MAIN, 12 IN. DIA. <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot for the type and size of sanitary sewer force main pipe shall be <br /> full compensation for all labor, material, incidentals, tools and equipment necessary to <br /> satisfactorily complete the work as defined in Section 7-20 of the Standard Specifications and <br /> these Special Provisions and as shown on the Plans. <br /> The unit price per linear foot of HDPE force main pipe shall be full payment for furnishing, <br /> hauling, and assembling in place the completed installation including all ductile iron fittings, <br /> tees, crosses, reducers, couplings, and sleeves required for complete installation along the run <br /> of each pipe size, as shown on the Plans and specified herein. <br /> The unit price of sanitary sewer force main pipe shall also include, but is not limited to; all costs <br /> for trench excavation; hauling and disposing of surplus material; dewatering, furnishing, <br /> stockpiling, hauling, placing and compacting suitable native backfill; furnishing, stockpiling, <br /> hauling, placing and compacting sand for pipe zone bedding; cleaning and flushing pipes and <br /> existing structures; testing and inspecting pipe; and replacing, protecting and maintaining <br /> utilities. Additionally, the following shall be included in the unit price for this bid item: <br /> 1. Utility or light pole holding in conformance with the requirements of the applicable utility <br /> including scheduling with the utility to hold poles. <br /> ' 2. Temporary thrust blocking and dead man blocks, and temporary and permanent restraint <br /> systems. <br /> ' 3. Pipe separation pads per section 7-08.3(2)J or sand backfill between forcemain and <br /> other pipes. <br /> 4. Pressure testing of all force mains per section 7-20.3(12) of the Standard Specifications <br /> and the Special Provisions. <br /> 5. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 6. Detectable Marking Tape per section 7-09.3(20). <br /> The costs for pot-holing and excavation required to determine exact depths and locations of <br /> other utilities shall be considered as incidental to the work and these costs shall be included in <br /> the unit contract price. Furnishing, hauling and placing of import trench backfill (Gravel Borrow) <br /> shall be paid under "Gravel Borrow". <br /> Work required to avoid unexpected or unforeseen obstacles shall be paid for under the Force <br /> Account item. <br /> ' Measurement and payment shall be per linear foot pipe measurement shall be based on the <br /> actual horizontal length of pipe, measured to the nearest linear foot. The point of beginning or <br /> ending of measurement in any particular run of pipe shall be the vertical intersection of the <br /> centerline of the pipe measured with the center line of the intersection pipe, or with the <br /> beginning or ending of any new linear length of valves or couplings contained within the <br /> measured length. At changes in pipe size connected by a reducer, the point of measurement <br /> shall be taken as the midpoint of the reducer. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division D—BID ITEM DESCRIPTIONS April 2016 <br /> SP -45 <br />