My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS ' <br /> BID ITEM A-39: SIDE SEWER CONNECTION 1 <br /> Measurement and Payment: Unit Price Per Each <br /> The unit price per each side sewer connection shall be full compensation for all labor, material, , <br /> tools and equipment necessary to satisfactorily complete the work as defined in Section 7-18 of <br /> these Special Provisions and as shown on the Plans. <br /> Included in this bid item is locating the existing side sewer, replacing the side sewer as shown <br /> on the Contract Plans, connection to the main pipe and existing side sewer, fittings per Plan <br /> Details and COE Standard Drawings. I <br /> Included in this bid item are all costs for trench excavation, removing and disposing of pavement <br /> sidewalk, curb, miscellaneous surfacing, landscape materials or sod, removing and disposing of <br /> existing side sewer pipe; hauling and disposing of surplus or unsuitable materials; excavation; <br /> backfill; dewatering; sewage bypassing; stockpiling, hauling, cleaning and flushing pipes; testing <br /> and inspecting and replacing; protecting and maintaining adjacent utilities. <br /> All costs in jointing dissimilar side sewer pipe with a coupling shall be included in the unit price <br /> for this bid item. <br /> Restoration of private improvements in streets and private property affected by side sewer <br /> construction and not otherwise included in other bid items, shall be considered incidental to this <br /> bid item, except, where restoration of private improvements listed in item 1 under of Force I <br /> Account Bid Item, and as authorized by the Engineer, that restoration work will be done by <br /> Force Account. <br /> BID ITEM A-40 & B-36: CONCRETE CURB, TYPE E-1 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot of Concrete Curb and Gutter, Type E-1 shall be full <br /> compensation for all labor, equipment, materials, and incidentals, including forms, necessary to <br /> perform the work and shall include the replacement of concrete curbs or curb and gutter <br /> impacted by construction activities and curb ramp installation in accordance with the Contract <br /> Documents. <br /> The cost of removing existing curbing, haul and disposal, and subgrade preparation is incidental , <br /> and shall be included in the unit price for this bid item. Installation of curb depressions for <br /> driveway cuts and curb ramps shall be incidental to these items and no separate payment will <br /> be made. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. I <br /> BID ITEM A-41 & B-37: CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 3 <br /> Measurement and Payment: Unit Price per Square Yard , <br /> Measurement shall be per square yard as delineated by the Contractor in accordance to the <br /> COE Standard Drawing 307 and 309 and approved by the Inspector prior to removal. I <br /> The unit price per square yard of Cement Concrete Driveway Types 1 and 3 shall be full <br /> compensation for all tools, materials, labor, and equipment necessary for replacement of <br /> concrete driveway approach impacted by construction activities and shown on the Plans and in <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division D-BID ITEM DESCRIPTIONS April 2016 <br /> SP -46 <br />