My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 - GENERAL REQUIREMENTS <br /> ' Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> The Project is in Everett, Washington, and is generally bounded by Grand Avenue to the <br /> west, Wetmore Avenue to the east, 19th Street to the south and 14th Street to the north. <br /> ' The Work includes, but is not limited to construction of approximately: 706 LF of 10-inch to <br /> 12-inch diameter combined sewer; 1,930 LF of 21-inch to 24-inch combined sewer; <br /> replacement of over 63 existing side sewers; 3,233 LF of 12-inch to 15-inch diameter storm <br /> ' drainage pipe; 3,606 LF of 18-inch to 24-inch storm drainage pipe; including all <br /> appurtenances, restoration and other such Work as may be necessary, in accordance with <br /> the Contract Documents. <br /> ' Design Engineer <br /> (******) <br /> Questions and inquiries about these Contract Documents should be directed to the <br /> ' attention of David Voigt, phone (425) 257-8983. <br /> Standard Specifications <br /> (******) <br /> ' All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> ' Documents. These Specifications are incorporated by reference, made a part of this <br /> Contract and shall control and guide all activities within this Project whether referred to <br /> directly, paragraph by paragraph. <br /> ' WSDOT/APWA "2014 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred to as the <br /> "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following other specifications and <br /> standard plans shall apply to the extent to which they are called out in these Plans and <br /> ' Special Provisions. <br /> 1. City of Everett "Design and Construction Standards and Specifications", latest <br /> ' edition as found on the Web at <br /> "http://www.ci.everett.wa.us/GetDoc.aspx?DocID=273". <br /> 2. "Standard Plans for Road and Bridge Construction," as prepared by WSDOT. <br /> ' 3. "Manual on Uniform Traffic Control Devices" (MUTCD). <br /> 4. APWA Standards. <br /> 5. AWWA Standards. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.