My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> comparable Standard Specification, or is a new Provision. The deletion, amendment, <br /> alteration, or addition to any subsection or portion of the Standard Specifications is meant <br /> to pertain only to that particular portion of the section, and in no way should it be interpreted <br /> that the balance of the section does not apply. <br /> Sections and subsections in the Special Provisions labeled under the headers with (******) ' <br /> indicate City of Everett Provisions. <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Section 1-01.3 is amended by adding the following: <br /> All references in the Standard Specifications to the terms "State", "Department of <br /> Transportation", "Washington State Transportation Commission", "Commission", <br /> "Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall <br /> be revised to read "City". , <br /> All references to "State Materials Laboratory" shall be revised to read "City designated <br /> location". <br /> Additive: A supplemental unit of work or group of bid items, identified separately in <br /> 111 <br /> the Proposal, that may, at the discretion of the City, be awarded in addition to the base <br /> Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items, <br /> identified separately in the Proposal, from which the City may make a choice between <br /> different methods or material of construction for performing the same Work. <br /> Award Date: The date of the formal action by the Everett City Council to accept the <br /> lowest responsible and responsive Bidder for the Work. <br /> Bid Documents: The component parts of the proposed Contract which may include, <br /> but are not limited to, the Proposal Form, the proposed Contract Provisions, the <br /> proposed Contract Plans, and Addenda. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> COE. City of Everett <br /> Change Order: Reference to Change Order shall include all rights of the City and <br /> Contractor under 1-04.4 CHANGES. Agreed Change Orders shall be in the form <br /> attached as Exhibit 1. Unilateral Change Orders shall be in the form attached as <br /> Exhibit 2. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical <br /> work, including Punch List, is complete and Contractor has completed and fulfilled all <br /> contractual obligations except any maintenance of landscaping. Contractual <br /> obligations that must be fulfilled prior to achievement of the Completion Date include, <br /> but are not limited to, the Contractor's furnishing all documentation, including correct, <br /> complete and accurate as-built or record drawings and operation and maintenance <br /> manuals and transfer of warranties. (This definition replaces the definition in WSDOT <br /> 1-01.3 for Completion Dates.) <br /> Contract: Written agreement signed between the Owner and Contractor and includes <br /> Division C — CONTRACT, Division P - PROPOSAL, Division D — BID ITEM <br /> DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications and <br /> amendments, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP—60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.