My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2. Moisture conditions and indicated water tables will not vary from those <br /> found at the time the borings were made, and <br /> 3. The ground at the location of the borings has not been physically <br /> disturbed or altered after the boring was made. <br /> Supplement 1-02.4(2) by adding the following: <br /> The boring log data and soil sample data, if any, can be found in Appendix E. <br /> If there is a geotechnical report made by the City, Bidder may contact City of <br /> Everett Project Manager to arrange to view the geotechnical report. <br /> 1-02.5 Proposal Form <br /> Delete the first paragraph of 1-02.5 and substitute the following: <br /> Bidder shall submit Bidder's Proposal on the Proposal Form provided in the Contract 1 <br /> Documents. <br /> 1-02.6 Preparation of Proposal <br /> Delete "unless it approves in writing" from the second sentence of the first paragraph of 1- <br /> 02.6. <br /> Revise the fourth paragraph of 1-02.6, beginning with "The Bidder shall submit with the Bid <br /> a completed", to read as follows: <br /> Contractor agrees that the Contractor shall actively solicit the employment of minority <br /> group members. Contractor further agrees that the Contractor shall actively solicit <br /> Bids for the subcontracting of goods or services from qualified minority businesses. <br /> Contractor shall furnish evidence of the Contractor's compliance with these <br /> requirements of minority employment and solicitation. Contractor further agrees to <br /> consider the grant of subcontracts to said minority bidders on the basis of substantially <br /> equal proposals in the light most favorable to said minority businesses. The <br /> Contractor shall be required to submit evidence of compliance with this section as part <br /> of the Bid. As used in this section, the term "minority business" means a business at <br /> least fifty-one percent of which is owned by minority group members. Minority group <br /> members include, but are not limited to, blacks, women, Native Americans, Asians, <br /> Eskimos,Aleuts, and Hispanics. I <br /> Delete the seventh paragraph of 1-02.6 and substitute the following: <br /> If the Proposal is made by an individual, his or her name, signature, and post office <br /> address must be shown; if made by a firm or partnership, the name and post office <br /> address of the firm or partnership, a list of the partners, and the signature of at least <br /> one of the general partners must be shown; if made by a corporation, the Proposal <br /> shall show the name of the state under the laws of which the corporation is chartered, <br /> the name and post office address of the corporation, and the title of the person who <br /> signs on behalf of the corporation. If the Proposal is made by a joint venture, the <br /> Proposal shall be signed by a representative of one of the joint venture firms. <br /> Additionally, the Proposal shall include a copy of the resolution or agreement <br /> empowering the representative to execute the Proposal and bind the joint venture. <br /> Supplement 1-02.6 by adding the following: <br /> In the event that the product of a unit price and an estimated quantity does not equal <br /> the extended amount quoted, the unit price shall govern, and the correct product of the <br /> unit price and the estimated quantity shall be deemed to be the amount bid. If the sum <br /> of two or more items in a bidding schedule does not equal the total amounts quoted, <br /> the individual item amounts shall govern and the correct total shall be deemed to be <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.