My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> ' 1-02.4(1) General <br /> Delete the fifth paragraph of 1-02.4(1), beginning with "Bid prices shall reflect", and <br /> substitute the following: <br /> ' Bid prices shall include everything necessary for the completion of the Work <br /> including, but not limited to, providing the materials, equipment, tools, plant and <br /> other facilities, and the management, superintendence, labor, and all necessary <br /> testing services. <br /> Supplement 1-02.4(1) by adding the following: <br /> Bidder acknowledges that he/she has not relied on representation or warranty of <br /> the City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> supplement to, the independent verification by the Bidder to the extent such <br /> independent investigation of the Drawings and Specifications or Site conditions is <br /> deemed necessary or desirable by the Bidder. Bidder acknowledges that they <br /> have not relied upon City or Engineer furnished information regarding site <br /> I conditions in preparing and submitting a Bid. <br /> Further supplement 1-02.4(1) by adding the following: <br /> 1-02.4(1)A Interpretation of Contract Documents <br /> Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Plans, Specifications, or Special Provisions, or should the Bidder be in doubt as to <br /> their meaning, Bidder may submit to the Engineer a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> prompt delivery. Any interpretation of the documents, if made, will be made only <br /> ' by addendum duly issued and a copy of such addendum will be mailed or <br /> delivered to each Bidder receiving a set of such documents. All requests for <br /> interpretations must be received by the City or Engineer no later than 7 <br /> calendar days prior to the Proposal opening date. All questions regarding the <br /> Contract Documents shall be referred to the City or Engineer at the address <br /> provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> Bidder is directed to 1-07.9(1) of these Special Provisions for requirements <br /> regarding applying payment of prevailing wage rates for employment of labor on <br /> within Snohomish County. <br /> 1-02.4(2) Subsurface Information <br /> Delete the first paragraph and substitute the following: <br /> If the City has made subsurface investigation of the site of the proposed Work, the <br /> boring log data and soil sample test data accumulated by the City will be made <br /> ' available for inspection by the Bidders. The boring logs and soil sample test data <br /> shall NOT be considered as part of the Contract. In addition, the City makes no <br /> representation or warranty expressed or implied that: <br /> 1. The Bidders' interpretations from the boring logs are correct, <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP-65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.