Laserfiche WebLink
111 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> recommendation to the City. If the City concurs in the claim of error, the Bidder will be <br /> relieved of responsibility, and the bid deposit of the Bidder will be returned. Thereafter, <br /> at the discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> responsive Bidder. <br /> Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> (******) <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from111 <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute <br /> the Contract set forth in the Contract Documents. <br /> 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> Successful Bidder has 14 calendar days after receiving the Notice of Award to submit I <br /> the following documents to the City: <br /> • Two (2) executed copies of the Contract. <br /> • Two (2) original payment bonds and two (2) original performance bonds <br /> submitted on forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance" of the Special Provisions. I <br /> If the Bidder experiences circumstances beyond their control that prevents return of <br /> the Contract Documents within 14-calendar days after the Award Date, the City may <br /> grant more time for return of the documents, provided the City deems the <br /> circumstances warrant it. <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> The Contractor shall provide a separate payment bond and performance bond, each in <br /> the amount of 100 percent of the Contract Sum and each in the form contained in the <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a <br /> corporation duly and legally licensed to transact surety business in the State of <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP -70 <br /> I <br />