Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of three hundred sixty-five (365) <br /> calendar days after Final Acceptance. The bonds must be executed by a duly licensed <br /> surety company, which is listed in the latest Circular 570 of the United States Treasury <br /> Department, as being acceptable as surety on federal bonds. No surety's liability on <br /> the bond shall exceed the underwriting limitations for the respective surety specified in <br /> Circular 570. The bonds must be signed by an officer of the Contractor empowered to <br /> sign binding instruments. The bonds must be accompanied by a fully executed and <br /> original power of attorney for the officer executing on behalf of the surety. The scope <br /> of the bonds or the form thereof prescribed in these Contract Documents shall in no <br /> way affect or alter the liabilities of the Contractor to the Owner as set forth in the <br /> Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03.7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett <br /> Municipal Code, "Bid Protest Procedures". <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-04 SCOPE OF THE WORK <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: <br /> 1 1-04.1(3) Specifications and Plans <br /> (******) <br /> 1-04.1(3)A Interpretation of Specifications and Plans <br /> rThe Specifications and Plans are intended to be explanatory and supportive of <br /> each other. Work specified on the Plans and not in the Specifications, or vice <br /> versa, shall be executed as if specified in both. In the event the Work to be done <br /> or matters relative thereto are not sufficiently detailed or explained in the Contract <br /> Documents, the Contractor shall immediately ask the City's Representative for <br /> further explanation and shall comply with such explanation. In the event of doubt <br /> or question arising respecting the true meaning of the Specifications or Plans, <br /> Contractor shall refer to the City's Representative for its decision. <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-71 <br /> I <br />