My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of three hundred sixty-five (365) <br /> calendar days after Final Acceptance. The bonds must be executed by a duly licensed <br /> surety company, which is listed in the latest Circular 570 of the United States Treasury <br /> Department, as being acceptable as surety on federal bonds. No surety's liability on <br /> the bond shall exceed the underwriting limitations for the respective surety specified in <br /> Circular 570. The bonds must be signed by an officer of the Contractor empowered to <br /> sign binding instruments. The bonds must be accompanied by a fully executed and <br /> original power of attorney for the officer executing on behalf of the surety. The scope <br /> of the bonds or the form thereof prescribed in these Contract Documents shall in no <br /> way affect or alter the liabilities of the Contractor to the Owner as set forth in the <br /> Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03.7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett <br /> Municipal Code, "Bid Protest Procedures". <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-04 SCOPE OF THE WORK <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: <br /> 1 1-04.1(3) Specifications and Plans <br /> (******) <br /> 1-04.1(3)A Interpretation of Specifications and Plans <br /> rThe Specifications and Plans are intended to be explanatory and supportive of <br /> each other. Work specified on the Plans and not in the Specifications, or vice <br /> versa, shall be executed as if specified in both. In the event the Work to be done <br /> or matters relative thereto are not sufficiently detailed or explained in the Contract <br /> Documents, the Contractor shall immediately ask the City's Representative for <br /> further explanation and shall comply with such explanation. In the event of doubt <br /> or question arising respecting the true meaning of the Specifications or Plans, <br /> Contractor shall refer to the City's Representative for its decision. <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-71 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.