7 <br /> Agreement for Murray,Smith and Associates <br /> Everett,WA <br /> May 12,2016 <br /> 4. Based on above preliminary layouts and schematic design plan, show that earthwork <br /> cut/fill balance is achieved to the extent possible. <br /> 5. Prepare recommendations for surface water recirculation system to maintain pond water <br /> quality. <br /> 6. Prepare preliminary stream layouts based on information and design criteria provided by <br /> Gary Sayre and Consultant. <br /> 7. Assist Consultant with layout and routing of golf course drainage system into the pond <br /> system so as to assure effective golf course drainage functions. <br /> 8. Define a strategy to maintain golf play during construction, which may include the <br /> development of an alternate hole to be played during construction of proposed pond and <br /> stream improvements. <br /> 9. Based on schematic design plan, prepare preliminary construction budget. <br /> 10. Sub Consultant will review the schematic design plan, strategy, theme and budget with <br /> the City to determine an agreed upon plan. Upon City's approval, the overall plan <br /> concepts will be finalized in Task 3 below. <br /> Deliverables <br /> 1. Schematic plan for the Project. <br /> 2. Safety analysis examining the interface between golf holes, cart path circulation and <br /> pond/stream improvements. <br /> 3. Preliminary pond and stream layout and grading plans. Plans shall indicate sizes, shapes <br /> and elevations of proposed golf features(drawing scales vary). <br /> 4. Estimate of earthwork cut/fill quantities and preliminary earthmoving balance. <br /> 5. Preliminary construction cost estimate for pond, stream and golf course improvements, <br /> work area restoration, landscaping etc. that would be performed by a specialty(golf <br /> course)contractor. <br /> 6. Outline of technical specifications for areas of work to be performed by specialty(golf <br /> course)contractor. <br /> 7. Final schematic design illustrative suitable for presentation. <br /> 8. One(1) public presentation illustrating the Schematic Design for the Project. <br /> 9. Phasing/construction recommendations to maintain golf operations during construction. <br /> Task 3 - Final Design (Construction Documents and Contractor Selection) <br /> Construction Documents Phase: <br /> Objectives <br /> 1. Advance the preliminary design to produce final design documents to be incorporated <br /> into the Contract Documents for the NWSS project produced by Consultant and suitable <br /> for public works bidding and construction. <br /> 2. Prepare final documentation drawings that incorporate the most current information <br /> regarding construction practices. <br /> 3. Accomplish necessary review and approval of the documents and by City management <br /> and administration. <br /> 4. Gain concurrence from PGC related to the design and construction approach. <br /> Tasks <br /> 3 <br /> 14114 Blue River Trail • Broomfield, CO 80023-3913 • 503.799.2682•tschoeder(c�icongolfstudio.com <br /> http://wvomich6olfstudio.com <br />