Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider twenty two thousand dollars ($22,000.00) upon completion of the work, <br /> subject to the maximum stated in¶4(D)of this Agreement. <br /> A breakdown of the compensation is as follows: <br /> LUMP SUM COMPENSATION <br /> Evaluation and Schematic Design Services $5,000.00 <br /> Design Development Services $6,500.00 <br /> Construction Documents Services $7,750.00 <br /> Bidding Services $500.00 <br /> Construction Administration Services $2,250.00 <br /> SUBTOTAL $22,000.00 <br /> DESIGN CONTINGENCY FEE(IF REQUIRED) <br /> Additional Services that may be needed based upon any issues that surface during the design and construction <br /> of the project as.approved only in writing and signed by an authorized City representative. <br /> TOTAL CONTINGENCY FEE $4,000.00 <br /> TOTAL FEE $26,000.00 <br /> Page 1 of 1 <br />