My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dykeman, Inc. 7/13/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
Dykeman, Inc. 7/13/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:34:03 AM
Creation date
7/18/2016 11:33:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Dykeman, Inc.
Approval Date
7/13/2016
Council Approval Date
7/6/2016
End Date
7/31/2017
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Architectural Services Main Library Window
Tracking Number
0000168
Total Compensation
$27,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION ADMINISTRATION SERVICES-Part V <br /> 1. Assist the Owner in reviewing Shop Drawings,Product Data and Samples,for the limited purpose of checking <br /> for conformance with information given and the design concept expressed in the contract documents. <br /> 2. Attend Three(3)project site visits,including preparation and distribution of field reports. <br /> 3. Prepare substantial completion observations(punchlist). <br /> ADDITIONAL SERVICES(If requested by Owner) <br /> 1. Preparing materials for and attending public presentations,meetings or hearings unless specifically defined in <br /> the Basic Services part of the Proposal. <br /> 2. Revising drawings previously approved by Owner,Tenants or Governmental Authorities. <br /> 3. Preparing documents for Change Directives,Change Order Proposals,or Change Orders and Drawings for <br /> changes not under the control of the Architect or Architect's consultants. <br /> 4. Value Engineering participation and implementation. <br /> 5. Code Analysis or Life Cycle Cost Analysis if required by the Owner or Governmental Approvals. <br /> 6. Post contruction Services after Substantial Completion of the project and"follow up"services related to the <br /> contruction and operation of the building systems after the fmal completion. <br /> 7. Preparation of detailed"As Built"record drawings. <br /> 8. Professional Construction Cost Estimating. <br /> CONSULTANT SERVICES NOT INCLUDED <br /> 1. No consultant services are included in this contract. <br /> Page 12 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.