My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> The Contractor is responsible for determining final quantities of providing plant material <br /> to complete the Plans as shown. The Contractor shall coordinate with the Engineer the <br /> final location for all plant materials prior to site delivery. The Contractor shall neither <br /> deliver to the site nor install planting materials until authorized by the Engineer. <br /> The Engineer shall reserve the option of selecting and reviewing plant material at the <br /> nursery. The Contractor shall provide the Engineer with at least one week notice prior <br /> to preparing plants for shipping. <br /> Field adjustments for plant layout shall be approved by the Engineer prior to <br /> installation. <br /> 8-02.4 page 115 is revised as follows: <br /> Measurement <br /> Section 8-02.4 is supplemented with the following: <br /> "PSIPE, 1 gallon" will be measured per each (PSIPE is Plant Selection Including Plant <br /> Establishment.) <br /> "PSIPE, Live stake" will be measured per each. <br /> Plantings shall be measured as lump sum. <br /> Section 8-02.5 page 115 is revised as follows: <br /> Payment <br /> Section 8-02.5 is supplemented with the following: <br /> (******) <br /> ' Payment will be made in accordance with Section 1-04.1 for the following bid items: <br /> "Planting," per lump sum. <br /> The contract price for "Planting" shall be full pay for all labor, materials, tools and <br /> equipment necessary to install plant material in the limits of work and elsewhere on the <br /> site including all costs for the labor, supplies, equipment, and materials needed to furnish <br /> PSIPE container plants, live stakes, or other plant material. The contract price for <br /> "Planting" shall be full compensation for all labor tools, equipment, and supplies necessary <br /> for weed control, preparing work plans, updating schedules, providing traffic control, <br /> planting installation and establishment, irrigation, planting area preparation, fine grading, <br /> raking, planting, cultivating, plant storage and protection, fertilizer and root dip, staking, <br /> cleanup, and water necessary to complete planting operations. <br /> I <br /> 7 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.