My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> No measurement will be made for "Coir Log". <br /> Section 8-01.5 page 112 is revised as follows: <br /> Section 8-01.5 is supplemented with the following: <br /> The cost of labor and materials required for hauling, installation, maintenance and <br /> removal of "Turbidity Curtain" shall be included in the lump sum contract price for <br /> "Erosion Control and Water Pollution Prevention". <br /> 1 <br /> Delete the following paragraphs from Payment <br /> i "Wetland Seeding", per acre, <br /> The unit contract price for "Wetland Seeding" and "Upland Seeding," per acre shall be <br /> full compensation for the complete operation of applying the seed. <br /> "Water Control" per lump sum. <br /> The lump sum Contract price for "Water Control" shall be full pay for all labor, <br /> 1 8-02.3(5) page 114 is revised as follows: <br /> Planting Area Preparation <br /> Delete the third paragraph of Section 8-02.3(5) and replace with the following: <br /> The areas shall be brought to finished grade before planting. All excess material and <br /> debris, stumps, and rocks larger than 3 inches, shall be removed and disposed of off the <br /> project site or as approved by the Engineer. The costs of removing all excess material and <br /> debris shall be considered incidental to and included in the lump sum unit contract prices of <br /> other items in this contract. <br /> I <br /> 8-02.3(7) page 114 is revised as follows: <br /> Layout of Planting <br /> Section 8-02.3(7) is deleted and replace by the following: <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.