My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 when they arise. The parties intend that all Claims and Disputes be resolved quickly and <br /> 2 expeditiously and desire to avoid claims and Disputes that relate back to events or work <br /> 3 occurring months before. The parties desire to avoid litigation and the costs and <br /> 4 expense of Claims and Disputes at the end of the Project. <br /> 5 <br /> 6 Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or <br /> 7 Contract Claim of any kind whatsoever, must be submitted, if at all, to the Owner or <br /> 8 Owner's Representative no later than thirty (30) days after Notice was first required to be <br /> 9 given by the Contractor as provided in section 1-04.5 Notice by the Contractor. Failure <br /> 10 to submit a Contract Claim within the thirty (30) days of the date Notice was required <br /> 11 pursuant to section 1-04.5 Notice by the Contractor constitutes a complete waiver of and <br /> 12 bar to the Contract Claim, and Contractor is estopped from later asserting a Contract <br /> 13 Claim or seeking any relief or remedy relating to the Dispute for which it failed to submit <br /> 14 a Claim. <br /> 15 <br /> 16 Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever <br /> 17 against the Owner on any Contract Claim or Dispute after the expiration of one hundred <br /> 18 eighty (180) days from Physical Completion. <br /> 19 <br /> 20 1-09.11A Remedies <br /> 21 <br /> 22 Section 1-09.11A is modified in full to read as follows: <br /> 23 <br /> 24 1-09.11A(1) General <br /> 25 <br /> 26 If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall be <br /> 27 those provided in this subsection. Contractor must timely and strictly comply with the <br /> 28 requirements of sectionl-04.5 Notice by the Contractor, section 1-09.11(2) Claims and <br /> 29 all other Contract Documents relating to the Contract Claim. Adjustments to Contract <br /> 30 Time shall be determined pursuant to section 1-08.3 Progress Schedule and 1-08.8 <br /> 31 Extensions of Time. Failure to comply strictly and timely shall be deemed a waiver of <br /> 32 the Contract Claim. <br /> 33 <br /> 34 1-09.11A(2) Extra Work <br /> 35 <br /> 36 1-09.11A(2)(A) Adjustment of Contract Sum <br /> 37 If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the <br /> 38 adjustment shall be calculated and paid as provided in section 1-09.4 Equitable <br /> 39 Adjustment. This amount includes jobsite and home office overheads for such work, <br /> 40 including any schedule delays relating to such work. Therefore, no compensation in <br /> 41 addition to that provided in section 1-09.6 Force Account shall be paid for such thing as <br /> 42 extended overhead or other costs or damages. <br /> 43 <br /> 44 1-09.11A(2)(B) Extension of Contract Time <br /> 45 Extensions of Contract Time caused by Extra Work shall be determined as provided in <br /> 46 section 1-08.3 Progress Schedule and section 1-08.8 Extensions of Time <br /> 47 1-09.11A(3) Delays <br /> 48 <br /> 49 1-09.11A(3)(A) Owner Caused Delay Unrelated to Extra Work <br /> 50 <br /> 51 1-09.11A(3)(A)(1) Adjustment of Contract Sum <br /> 52 1 <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.