Laserfiche WebLink
1 <br /> 2 Section 6-19, Shafts <br /> 3 January 4, 2016 <br /> 4 6-19.4 Measurement <br /> 5 The first paragraph is revised to read: <br /> 6 <br /> 7 Soil excavation for shaft, including haul, will be measured by the cubic yards of shaft <br /> 8 excavated. The cubic yards will be computed using the shaft diameter, top of shaft <br /> 9 elevation and bottom of shaft elevation shown in the Plans, less all rock excavation <br /> 10 measured as specified for rock excavation. Excavation between the existing ground line <br /> 11 and the top of shaft elevation is considered incidental to soil excavation for shaft and will <br /> 12 not be measured. <br /> 13 <br /> 14 The second paragraph is deleted. <br /> 15 <br /> 16 6-19.5 Payment <br /> 17 The paragraph following the bid item "Soil Excavation For Shaft Including Haul", per cubic yard <br /> 18 is revised to read: <br /> 19 <br /> 20 The unit Contract price per cubic yard for "Soil Excavation For Shaft Including Haul" shall <br /> 21 be full pay for performing the work as specified, including all costs in connection with <br /> 22 furnishing, mixing, placing, maintaining, containing, collecting, and disposing of all mineral, <br /> 23 synthetic, and water slurry, and disposing of groundwater collected by the shaft excavation, <br /> 24 and the incidental excavation of soils between the top of shaft elevation shown in the Plans <br /> 25 and the existing ground line. <br /> 26 <br /> 27 Section 8-01, Erosion Control and Water Pollution Control <br /> 28 January 4, 2016 <br /> 29 8-01.2 Materials <br /> 30 This section is supplemented with the following new paragraph: <br /> 31 <br /> 32 Recycled concrete, in any form, shall not be used for any Work defined in Section 8-01. <br /> 33 <br /> 34 Section 8-10, Guide Posts <br /> 35 January 4, 2016 <br /> 36 8-10.3 Construction Requirements <br /> 37 The last sentence of the second paragraph is deleted. <br /> 38 <br /> 39 Section 8-22, Pavement Marking <br /> 40 January 4, 2016 <br /> 41 8-22.4 Measurement <br /> 42 The first two sentences of the fourth paragraph are revised to read: <br /> 43 <br /> 44 The measurement for "Painted Wide Lane Line", "Plastic Wide Lane Line", "Profiled Plastic <br /> 45 Wide Lane Line", "Painted Barrier Center Line", "Plastic Barrier Center Line", "Painted Stop <br /> 46 Line", "Plastic Stop Line", "Painted Wide Dotted Entry Line", or "Plastic Wide Dotted Entry <br /> 47 Line" will be based on the total length of each painted, plastic or profiled plastic line <br /> ' 48 installed. No deduction will be made for the unmarked area when the marking includes a <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 5 <br />