Laserfiche WebLink
I <br /> 1 broken line such as, wide broken lane line, drop lane line, wide dotted lane line or wide ' <br /> 2 dotted entry line. <br /> 3 <br /> 4 8-22.5 Payment <br /> 5 The following two new Bid items are inserted after the Bid item "Plastic Crosshatch Marking", <br /> 6 per linear foot: <br /> 7 <br /> 8 "Painted Wide Dotted Entry Line", per linear foot. <br /> 9 <br /> 10 "Plastic Wide Dotted Entry Line", per linear foot. <br /> 11 <br /> 12 Section 9-03, Aggregates <br /> 13 January 4, 2016 <br /> 14 9-03.21(1)B Concrete Rubble I <br /> 15 This section, including title, is revised to read: <br /> 16 <br /> 17 9-03.21(1)B Recycled Concrete Aggregate <br /> 18 Recycled concrete aggregates are coarse and fine aggregates manufactured from <br /> 19 hardened concrete mixtures. <br /> 20 <br /> 21 Recycled concrete, in any form, shall not be placed below the ordinary high water mark of <br /> 22 any water of the State. <br /> 23 <br /> 24 Section 9-04, Joint and Crack Sealing Materials <br /> 25 January 4, 2016 <br /> 26 9-04.2(1) Hot Poured Joint Sealants <br /> 27 This section's content is deleted and replaced with the following new subsections: <br /> 28 <br /> 29 9-04.2(1)A Hot Poured Sealant <br /> 30 Hot poured sealant shall be sampled in accordance with ASTM D5167 and tested in <br /> 31 accordance with ASTM D5329. Hot poured sealant shall have a minimum Cleveland Open <br /> 32 Cup Flash Point of 205°C in accordance with AASHTO T 48. <br /> 33 <br /> 34 9-04.2(1)A1 Hot Poured Sealant for Cement Concrete Pavement <br /> 35 Hot poured sealant for cement concrete pavement shall meet the requirements of <br /> 36 ASTM D6690 Type IV, except for the following: <br /> 37 1�38 1. The Cone Penetration at 25°C shall be 130 maximum. <br /> 39 <br /> 40 2. The extension for the Bond, non-immersed, shall be 100 percent. <br /> 41 <br /> 42 9-04.2(1)A2 Hot Poured Sealant for Bituminous Pavement <br /> 43 Hot poured sealant for bituminous pavement shall meet the requirements of ASTM <br /> 44 D6690 Type II. <br /> 45 <br /> 46 9-04.2(1)B Sand Slurry for Bituminous Pavement <br /> 47 Sand slurry is mixture consisting of the following components measured by total weight: <br /> 48 <br /> 49 1. Twenty percent CSS-1 emulsified asphalt, <br /> 50 <br /> 1 <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 6 <br />