My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Provide: Furnish and install, complete in place. <br /> 2 Punch List: List of incomplete items of Work and of items of Work that do not conform <br /> 3 to the requirements of the Contract Documents. The Punch List is prepared after <br /> 4 Substantial Completion. <br /> 5 RCW: Means the Revised Code of Washington <br /> 6 Schedule of Values: Allocation of Contract Sum to items of Work as provided in <br /> 7 section 1-09.3(3)(A) Schedule of Values. <br /> 8 Shall: Required conduct. <br /> 9 Shown: Refers to information presented on the drawings, with or without reference to <br /> 10 the drawings. <br /> 11 Specifications: Includes 2008 WSDOT/APWA Standard Specifications, all <br /> 12 amendments herein, and all other specifications in this contract. <br /> 13 Specify: Refers to information described, shown, noted or presented in any manner in <br /> 14 any part of the Contract. <br /> 15 Submittals: The information required by the Contract Documents provided by <br /> 16 Contractor to the Owner's Representative or Owner. <br /> 17 Total Float: The amount of time any given activity or path of activities may be delayed I <br /> 18 before it will affect the Completion Date. <br /> 19 Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> 20 wheelchairs, and equestrian traffic. <br /> 21 Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> 22 Contractor's Overhead costs realized by the result of reduced Project and/or Contractor <br /> 23 billings due to any reason whatsoever, including a Project Extension. <br /> 24 Unit Price Work: Refers to items of Work identified by unit prices in the bid or proposal <br /> 25 form. I <br /> 26 <br /> 27 1-02 BID PROCEDURES AND CONDITIONS <br /> IONS <br /> 28 <br /> 29 1-02.1 Prequalification of Bidders <br /> 30 Section 1-02.1 is amended by adding the following: <br /> 31 To be considered a responsible bidder who is qualified to be awarded a public works project, <br /> 32 the bidder must meet the responsibility criteria set forth in Chapter 39.04 RCW as follows or as <br /> 33 amended:. <br /> 34 (a) At the time of bid submittal, have a certificate of registration in compliance with Chapter <br /> 35 18.27 RCW; <br /> 36 <br /> 37 (b) Have a current state unified business identifier number; 111 <br /> 38 <br /> 39 (c) If applicable, have industrial insurance coverage for the bidder's employees working in <br /> 40 Washington as required in Title 51 RCW; an employment security department number as <br /> 41 required in Title 50 RCW; and a state excise tax registration number as required in Title 82 <br /> 42 RCW; and <br /> 43 (d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br /> 44 39.12.065(3). <br /> 45 <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.