My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> I 2 <br /> 3 1-02.4(1) General <br /> I 4 Section 1-02.4(1) is amended by adding the following: <br /> 5 Before submitting its proposal, the bidder shall visit the site and familiarize itself with the <br /> 6 conditions under which its project is to be performed and correlate its observations with <br /> 7 the requirements of all contract plans, specifications, and conditions. <br /> I 8 <br /> 9 1-02.5 Proposal Forms <br /> I 10 The first paragraph of section 1-02.5 is amended by deletion of the first paragraph, as follows: <br /> 11 A -- - e'er.- , - -- -- -5 A - - - - --- - - -• - .- <br /> 12 project on which the bidder is eligible to bid. <br /> I 13 <br /> 14 Section 1-02.5 is further amended by adding the following: <br /> 15 The bidder shall submit its proposal on the forms found in the proposal specifications. <br /> 111 16 All blank spaces in the proposal form shall be properly filled in. In addition to writing in <br /> 17 the bid amount in numbers, be sure and write out the bid in words in the space provided <br /> 18 in the Proposal. Where conflict occurs, the written or typed words shall prevail. <br /> 19 Qualification of a bid will result in automatic rejection of the bid. <br /> I20 The Contracting Agency reserves the right to arrange the proposal forms with alternates <br /> 21 and additives, if such are to the advantage of the Contracting Agency. The bidder shall <br /> I 22 bid on all alternates and additives set forth in the proposal forms unless otherwise <br /> 23 specified. <br /> 24 Any correction to a bid made by inter-lineation, alteration, or erasure, shall be initialed by <br /> 25 the signer of the bid. The bidder shall make no stipulation on the Bid Form, nor qualify <br /> 26 the bid in any manner. <br /> 27 A bid by a corporation shall be executed in the corporate name, by the president or a <br /> I 28 vice president (or other corporate officer accompanied by evidence of authority to sign). <br /> 29 A bid by a partnership shall be executed in the partnership name, and signed by a <br /> 30 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any <br /> I 31 D/MIWBE requirements are to be satisfied through such an agreement. <br /> 32 A bid by a joint venture shall be executed in the joint venture name and signed by a <br /> 33 member of the joint venture. A copy of the joint venture agreement shall be submitted <br /> 34 with the Bid Form if any D/W/MBE requirements are to be satisfied through such an <br /> 35 agreement. <br /> 36 <br /> I 37 1-02.6 Preparation of Proposal <br /> 38 Supplement the second paragraph with the following: <br /> 39 4. If a minimum bid amount has been established for any item, the unit price must <br /> I 40 equal or exceed the minimum amount stated. <br /> 41 <br /> 42 The first subsection of the fifth paragraph of 1-02.6 is modified to read as follows (addition is <br /> 43 underlined): <br /> 44 "The bidder shall submit with the bid a list of: <br /> 45 1. Subcontractors who will perform the work of heating, ventilation and air <br /> I 46 conditioning, plumbing as described in Chapter 18.106 RCW and electrical as <br /> 47 described in Chapter 19.28 RCW, and <br /> 48 Bidder shall write "self' or otherwise clearly indicate in writing that it will self perform any <br /> 1 49 HVAC Work, plumbing as described in Chapter 18.106 RCW and electrical as described <br /> IRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.