My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> Special Provisions <br /> DIVISION 1 <br /> Section 1-09.7 pages 80-81 is Deleted: <br /> 1 4-0-94-Mobilization <br /> Section 1 09.7 is modified by adding the following: •.-- - _ -- - - -area, locations of the signs shall be approved by the Engineer. <br /> approved by Engineer prior to placement on job site. <br /> Identification Sign" detail on Standard Plan No. 712. Each of the two Construction <br /> of the sign face per Standard Plan No. 713. The Construction Identification Sign shall <br /> contain three lines of information: <br /> PROJECT NAME: <br /> PROJECT FUNDING: <br /> PROJECT COST: <br /> The above information shall be provided by the Engineer. <br /> The Construction Identification Signs shall be erected on portable wood sign frames. <br /> I "Construction Identification Sign Stand" detail on Standard Plan No. 711. Signs and sign <br /> throughout the progress of the work and shall be completely removed upon completion <br /> of the project and delivered to the City's storage area for future use by the City. <br /> No separate payment for Construction Identification Signs will be made. All costs <br /> associated with this item shall be merged with the unit contract price " <br /> Sanitary facilities shall be nearby. The location of the office shall be adj <br /> project and at a location acceptable to the Contractor and the Engineer. The office shall <br /> conditioning and heating. A telephone shall be installed for the sole use of the Engineer. <br /> It shall be a separate unit with a different telephone number than the Contractor's phone. <br /> All costs for the Engineer's office, including tcicphonc scrvice for local calls only, shall-bo <br /> 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.