Laserfiche WebLink
I <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> Special Provisions <br /> DIVISION 1 <br /> Section 1-09.7 pages 80-81 is Deleted: <br /> 1 4-0-94-Mobilization <br /> Section 1 09.7 is modified by adding the following: •.-- - _ -- - - -area, locations of the signs shall be approved by the Engineer. <br /> approved by Engineer prior to placement on job site. <br /> Identification Sign" detail on Standard Plan No. 712. Each of the two Construction <br /> of the sign face per Standard Plan No. 713. The Construction Identification Sign shall <br /> contain three lines of information: <br /> PROJECT NAME: <br /> PROJECT FUNDING: <br /> PROJECT COST: <br /> The above information shall be provided by the Engineer. <br /> The Construction Identification Signs shall be erected on portable wood sign frames. <br /> I "Construction Identification Sign Stand" detail on Standard Plan No. 711. Signs and sign <br /> throughout the progress of the work and shall be completely removed upon completion <br /> of the project and delivered to the City's storage area for future use by the City. <br /> No separate payment for Construction Identification Signs will be made. All costs <br /> associated with this item shall be merged with the unit contract price " <br /> Sanitary facilities shall be nearby. The location of the office shall be adj <br /> project and at a location acceptable to the Contractor and the Engineer. The office shall <br /> conditioning and heating. A telephone shall be installed for the sole use of the Engineer. <br /> It shall be a separate unit with a different telephone number than the Contractor's phone. <br /> All costs for the Engineer's office, including tcicphonc scrvice for local calls only, shall-bo <br /> 1 1 <br />