My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> borne by the Contractor and shall be included by the Contractor in the mobilization cost. <br /> DIVISION 2 <br /> Section 2-01.5 page 100 is revised as follows: <br /> Payment <br /> Section 2-01.5 is revised follows: <br /> (******) <br /> Payment will be made in accordance with Section 1-04.1 for the following bid items: <br /> "Clearing and Grubbing" per lump sum. <br /> The contract price for "Clearing and Grubbing" shall be full pay for all labor, materials, <br /> tools and equipment necessary to remove existing plant material from the work area and <br /> prepare the work area for other Earthwork and Miscellaneous Construction. This <br /> includes all costs for the work required to clear and grub the work area; remove and <br /> replace obstructions including fallen trees; protect trees; remove and dispose of trees; <br /> salvage tree(s) and place within the habitat berm; stump grinding of removed trees; <br /> invasive plant removal; --- _-e e :e - _ - - ••_-••_e- "- - _ , _•e _-_ ; clean <br /> up; prepare work plans; update schedules; and provide traffic control. <br /> There shall be no separate payment for "Tree Removal Plan," "Tree Removal" or <br /> "Pruning". This work shall be incidental to "Clearing and Grubbing." <br /> 1 Section 2-02.4 page 102 is revised as follows <br /> Measurement <br /> The following paragraph is deleted from Section 2-02.4 page 102: <br /> {December�, 2006) <br /> Hazardous material excavation including haul will be measured by the cubic yard. All <br /> was performed. An original ground measurement will be taken using cro.s section or <br /> digital terrain modeling survey techniques. The original ground will be compared with <br /> a survey of the excavation area taken after the work is completed. <br /> Section 2-02.5 pages 102-103 is revised as follows <br /> j Payment <br /> ■ Section 2-02.5 is revised to read as follows: <br /> (******) <br /> "Hazardous Material Excavation, Haul, Handling And Disposal", by force account as <br /> provided in Section 1-09.6. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.