My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> 1 3. A sufficient number of bench marks for levels to enable the Contractor to set <br /> I 2 grades at reasonably short distances. <br /> 3 4. Monuments and control points as shown on the Drawings. <br /> 4 The Contractor shall give the City 3 weeks notification to allow adequate time to <br /> I 5 provide the above data. <br /> 6 The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 7 1. Slope stakes ±0.1 foot <br /> I 8 2. Subgrade blue tops ±0.01 foot <br /> 9 3. Stationing ±0.01 foot <br /> 10 4. Alignment ±0.01 foot <br /> 11 5. Surfacing red & yellow tops ±0.01 foot <br /> 12 6. Superstructure elevations ±0.01 foot (from plan elevations) <br /> 13 7. Substructure ±0.02 foot (from plan elevations) <br /> I 14 <br /> 15 The Contractor shall stake the alignment and extents of the limits of work, staging areas, <br /> 16 channel excavation, proposed clearing and grubbing, breach excavation, and habitat <br /> 17 berms. Stakes shall be set at 50' maximum intervals. The Contractor shall survey the <br /> I 18 grades of the breach excavation areas, prior to earth disturbing activities, by taking <br /> 19 transects perpendicular to the channel alignment at 25 ft spacing. Transects shall <br /> 20 extend at minimum 10 feet beyond the top of the excavation shown on the Drawings <br /> I 21 After excavation is complete to the lines and grades on the Drawings, the contractor <br /> 22 shall repeat the transects. <br /> 23 <br /> I <br /> 24 <br /> 25 The Contractor shall slope stake the roadway before any construction may proceed. <br /> Slope stakes shall be set at 50' maximum intervals on tangents and 25' on curves. <br /> 26 Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br /> I 27 tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br /> 28 <br /> 29 The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br /> I 30 Contractor shall keep updated survey field notes in a standard field book and in a format <br /> 31 set by the Engineer. These field notes shall include all survey work performed by the <br /> 32 Contractor's surveyor in establishing line, grade and slopes for the construction work. <br /> 33 Copies of these field notes shall be provided to the Engineer upon request and upon <br /> I34 completion of the contract work; the field book shall be submitted to the Engineer and <br /> 35 become property to the City. <br /> 36 <br /> I 37 If the survey work provided by the Contractor does not meet the standards of the <br /> 38 Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br /> 39 individual or individuals doing the survey work and the survey work will be completed by <br /> 40 the Engineer at the Contractor's expense. Costs for completing the survey work required <br /> 41 by the Engineer will be deducted from monies due or to become due the Contractor. <br /> 42 <br /> I 43 The City may spot-check the Contractor's surveying. These spot-checks will not change <br /> 44 the requirements for normal checking and testing as described elsewhere, and do not <br /> 45 relieve the Contractor of the responsibility of producing a finished product that is in <br /> 46 accordance with the contract. <br /> 47 <br /> 48 In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> 49 correct and the Contractor shall correct the discrepancies before construction work may <br /> 50 proceed. No additional compensation will be paid for this corrective work. <br /> 51 <br /> 52 Payment: The lump sum contract price for"Surveying" shall be full pay for all costs <br /> II53 involved in furnishing all labor, tools, survey instruments, materials, and other equipment <br /> iRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.