Laserfiche WebLink
I <br /> I <br /> Section 2-08.3(1) Special Excavation Plan page 106 is supplemented with paragraph 9 as <br /> follows: <br /> 9. Ditch Block <br /> Import and place materials suitable to provide temporary construction access to the <br /> channel excavation and habitat berm area as shown on the Plans. Remove <br /> imported materials and restore access area upon completion. Native soil material <br /> (onsite sourced suitable material) shall be placed and shaped using an excavator <br /> bucket so that it plugs the existing ditch and conforms to the lines and grades shown <br /> on the plans. <br /> I <br /> Section 2-08.5 pages 106-107 is supplemented with the following: <br /> Payment <br /> "Initial Fish Exclusion", by Force Account a provided in Section 1-09.6. Contractor shall <br /> provide a detailed breakdown of anticipated costs for review prior to commencing work, <br /> including estimated number of work days, number of and rates for crew, materials, and <br /> other costs as appropriate. <br /> To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> amount in the Proposal to become a part of the Contractor's total Bid. <br /> I <br /> DIVISION 8 <br /> New information added to Section 8-01.3 inserted beginning page 107 <br /> Section 8-01.3 is supplemented with the following: <br /> TURBIDITY CURTAIN <br /> Description <br /> This work consists of installing a flexible, impenetrable barrier to prevent sediment from <br /> construction activities from entering adjacent water bodies. This curtain is weighted at the <br /> bottom to achieve closure and supported at the top through a flotation system. <br /> Materials <br /> Turbidity curtain shall be a Type II which is usually used in areas where there may be small to <br /> moderate current running (up to 2 knots or 3.5 feet per second) and / or wind and wave action <br /> can affect the curtain. Materials should be of bright colors. <br /> Floats (Expanded Polystyrene Billets within Fabric Pockets) <br /> Galvanized Steel Ballast Chain <br /> Pre-manufactured Turbidity Barrier <br /> Construction Requirements <br /> I <br /> 4 <br /> i <br />