My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> "Hazardous Material Excavation, Haul, Handling And Disposal" shall be full pay for all <br /> costs associated with excavating the material designated to be removed; hauling it to <br /> the stockpile location; stockpiling the excavated material; storing stockpiled <br /> hazardous waste and contaminated soils; collecting, handling and storing <br /> contaminated water; loading the stockpiled material into the hauling conveyance for <br /> transport to the disposal site; and transporting and disposing of hazardous or <br /> contaminated materials at an approved facility. <br /> ' -- - --•- -- • • - - -- e.-- - - --- • - - --e --• - - -- - , <br /> into the hauling conveyance for transport to the disposal site, and transporting and <br /> - -- - - - -- -- . -•- "-- - dous Material Handling And Disposal". <br /> To provide a common basis for all bidders, the Contracting Agency has entered an <br /> amount in the proposal to become a part of the Contractor's total bid. <br /> "Hazardous Material Excavation Incl. Haul", per force account. <br /> The unit contract price for "Hazardous Material Excavation Incl. Haul" shall be full <br /> pay for all costs associated with excavating the material designated to be removed, <br /> Section 2-08.3(1) pages 104-106 is revised as follows: <br /> 2-08.3(1) Special Excavation Plan <br /> Delete first paragraph: <br /> 5. Channel and Breach Excavation <br /> Owner's Representative will provide initial fish removal prior to start of Contractor's <br /> 1111 <br /> the Contractor and be performed in accordance with the Contractor's Fish Exclusion <br /> Protocol Plan. <br /> Replace with the following: <br /> 5. Channel and Breach Excavation <br /> Contractor shall contract for services for initial fish removal with a person or persons <br /> who have demonstrated successful similar experience and have implemented <br /> WSDOT Fish Exclusion Protocols and Standards within the last 3 years. <br /> Qualifications of personnel identified for fish removal shall be submitted to the Owner <br /> ' as part of the Contractor's Fish Exclusion Protocol Plan for review and approval. <br /> Subsequent fish removal shall be the responsibility of the Contractor and be <br /> performed in accordance with the Contractor's Fish Exclusion Protocol Plan. <br /> I <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.