My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 posted speed in miles per hour. Pavement drop-off warning signs shall be <br /> I2 placed in advance and throughout the drop-off treatment. <br /> 3 C) Temporary concrete barrier or other approved barrier installed on the traffic <br /> 4 side of the drop-off with 1 foot between the drop-off and the back of the barrier <br /> 5 and a new edge of pavement stripe a minimum of 2 feet from the face of the <br /> 6 barrier. An approved terminal, flare, or impact attenuator will be required at the <br /> 7 beginning of the section. For night use, the barrier shall have standard <br /> I8 delineation such as paint, reflective tape, lane markers, or warning lights. <br /> 9 4. Drop-offs more than 0.50 foot not within the traveled way or auxiliary lane shall be <br /> I 10 protected with appropriate warning signs and further protected as indicated in 3a, 3b, <br /> 11 or 3c if all of the following conditions are met: <br /> 12 a) The drop-off is less than 2 feet; <br /> I13 b) The total length throughout the project is less than 1 mile; <br /> 14 c) The drop-off does not remain for more than three working days; <br /> I 15 d) The drop-off is not present on any of the holidays listed in Section 1-08.5; and <br /> 16 e) The drop-off is only on one side of the roadway. <br /> I 17 <br /> 18 5. Drop-offs more than 0.50 foot that are not within the traveled way or auxiliary lane <br /> 19 and are not otherwise covered by No. 4 above shall be protected with appropriate <br /> I 20 warning signs and further protected as indicated in 3a or 3c. <br /> 21 6. Open trenches within the traveled way or auxiliary lane shall have a steel-plate cover <br /> 22 placed and anchored over them. A wedge of suitable material, if required, shall be <br /> I 23 placed for a smooth transition between the pavement and the steel plate. Warning <br /> 24 signs shall be used to alert motorists of the presence of the steel plates. <br /> 25 <br /> I 26 1-07.24 Rights of Way <br /> 27 Delete this section in its entirety, and replace it with the following: <br /> 28 <br /> I 29 Street right of way lines, limits of easements, and limits of construction permits are <br /> 30 indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 31 these limits, unless arrangements for use of private property are made. <br /> I 32 <br /> 33 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 34 way and easements, both permanent and temporary, necessary for carrying out the <br /> I 35 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 36 Contractor's attention by a duly issued Addendum. <br /> 37 <br /> 38 Whenever any of the work is accomplished on or through property other than public right <br /> I 39 of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 40 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 41 property. Copies of the easement agreements may be included in the Contract <br /> 42 Provisions or made available to the Contractor as soon as practical after they have been <br /> 43 obtained by the Engineer. <br /> 44 <br /> j 45 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 46 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 47 of the work in areas where right of way, easements or rights of entry have not been <br /> I48 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> IRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.