My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct the <br /> Contractor to perform the Extra Work on a Force Account basis. <br /> 6.3 Change Orders ' <br /> A. Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br /> Payment For Changes. Requests for an increase in Contract Time must be made as provided in <br /> 5.2.0 Extensions of Contract Time, as applicable. Substantial changes in Contract Time, <br /> Contract Sum or Work will often be negotiated and agreed between the Contractor and Owner <br /> before the Owner directs the Contractor to proceed with the change. <br /> B. If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and <br /> Contract Time,the Contractor and Owner shall execute an agreed Change Order. However, if the <br /> Contractor and Owner do not agree, the Owner may, in its sole discretion, issue a unilateral <br /> Change Order changing the scope of Work and making any adjustments to the Contract Sum <br /> pursuant to 9.2. Payment For Changes and Contract Time in such amount and for such time as <br /> the Owner thinks appropriate. Contractor agrees to use the agreed and unilateral Change Order <br /> attached to these General Conditions or otherwise provided by Owner. The Contractor accepts all <br /> requirements, terms and conditions of a Change Order by: signing it; writing a separate <br /> acceptance; or by failing to notify the Owner immediately in writing that Contractor disagrees <br /> with the Change Order and does not intend to be bound by its terms. I <br /> C. The Contractor waives and is estopped from denying its agreement with any unilateral Change <br /> Order for which the Contractor does not immediately give Notice to the Owner as provided in <br /> ARTICLE 10. NOTICE TO OWNER and submitting a Contract Claim as provided in <br /> ARTICLE 12. CONTRACT CLAIMS. A unilateral Change Order that is not timely protested <br /> as provided in this section shall be full payment and final settlement of all asserted and unasserted <br /> Contract Claims for Contract Time and all costs of any kind, including costs of Delays, <br /> inefficiencies and impacts,related to, arising out of, or resulting from, any Work described in the <br /> Change Order. <br /> D. The Contractor shall obtain written consent of the surety or sureties if the Owner's Representative I <br /> requests such consent. <br /> 6.4 Value Engineering and Cost Sharing , <br /> A. The Contractor may submit proposals for changing the Drawings, Specifications, or other <br /> requirements of the Contract bocuments and the Owner, in its sole discretion, may accept or <br /> reject such proposals. If accepted by the Owner and if the proposal decreases the direct, actual <br /> costs of constructing the Work, the Contract Sum shall be reduced by fifty percent(50%) of the <br /> direct, actual construction cost saved. Because the Owner has the sole discretion whether to <br /> consider, accept or reject the Contractor's proposal and the Contractor has no right to require the <br /> Owner to consider or accept such proposals,the Owner's decision is not reviewable by any court. <br /> This subsection applies only to change proposals initiated solely by the Contractor (or its <br /> Subcontractors and Suppliers) and does not apply to change proposals requested or initiated by <br /> the Owner or the Owner's Representative. The Owner is not obligated or required to consider <br /> any Contractor initiated change proposals and may, in its sole discretion, refuse to do so. Under <br /> no circumstances shall the Contractor be entitled to additional compensation arising out of, or <br /> related to,the Owner's refusal to consider or approve a Contractor initiated change proposal. The <br /> Contractor shall not do any of the following without the express written agreement of the Owner: <br /> PSO6 REROUTE 007213 -30 1 <br /> WO NO.—UP3583 MAY 2016 <br /> i <br />