I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' C. Subsequent to the Substantial Completion date, the Owner may exclude the Contractor from the <br /> Work during such periods when construction activities might interfere with the intended <br /> operation of the Project. The Owner, however, shall allow the Contractor reasonable access for <br /> completion or correction of incomplete Punch List items. <br /> 5.8 Acceptance of Work <br /> A. Upon completion of the Project, including, but not limited to,record drawings, as-builts, required <br /> reports and operations and maintenance manuals, the Contractor shall so notify the Owner's <br /> Representative in writing. Upon receipt of the notification, the Owner's Representative will <br /> promptly, by personal inspection, determine the actual status of the Work in accordance with the <br /> terms of the Contract. If the Owner's Representative fmds materials, Equipment, or <br /> workmanship that do not meet the terms of the Contract, he or she will prepare a Punch List of <br /> such items and submit it to the Contractor. Following completion of the corrective Work by the <br /> Contractor, the Owner's Representative will notify the Owner that the Work has been completed <br /> in accordance with the Contract. The Owner shall make the final determination of acceptability <br /> and completion. For portions of the Project not previously accepted as substantially complete, the <br /> conditions of guarantee shall commence on the date that the Owner determines the Project is <br /> complete. <br /> ARTICLE 6 CHANGES <br /> 6.1 Owner's Right to Direct Changes to the Work <br /> A. The Owner reserves the right to change the Work at any time. Such changes shall not invalidate <br /> the Contract nor release the surety, and the Contractor agrees to perform the Work as changed. <br /> Among others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this <br /> Contract,and <br /> 1 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications,designs, or both, <br /> ' 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment,materials,services,or sites,provided by the Owner,and <br /> 1 7. Ordering the Contractor to acceldrate or Delay Work. <br /> B. If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the <br /> ' Contract Sum and Contract Time, the Owner may, at its sole option, unilaterally direct the <br /> Contractor to implement any change by notice. The Owner shall not pay or be responsible or <br /> liable for any change implemented by the Contractor without explicit notice from the Owner to <br /> ' proceed. <br /> 6.2 Extra Work <br /> A. At its sole option, the Owner may (1) perform Extra Work itself, (2) employ others to do it, (3) <br /> direct the Contractor to perform the Extra Work at existing unit bid price, (4) direct the <br /> PSO6 REROUTE 007213 -29 <br /> WO NO.—UP3583 MAY 2016 <br /> 1 <br />