McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' ARTICLE 13 DISPUTES <br /> 13.1 Resolution <br /> A. When a Dispute occurs during a Contract, the Contractor shall pursue resolution through the <br /> Owner's Representative. The Contractor shall follow the procedure outlined ARTICLE 12. <br /> ' CONTRACT CLAIMS herein and 5.2.C. Extensions of Contract Time for issues regarding <br /> the schedule and Contract Time. Timely and adequate Notice is a condition precedent to a <br /> Contract Claim. Timely and complete submission of a Contract Claim is a condition precedent to <br /> any entitlement by the Contractor to an adjustment of Contract Sum or Contract Time. Unless <br /> 1 waived by the Owner, mediation is a condition precedent to the filing of any lawsuit, action or <br /> proceeding that seeks to recover on a Contract Claim,whether in whole or in part. <br /> ' 13.2 Continuing the Work <br /> A. Contractor shall carry on the Work and adhere to the schedule during all disputes or <br /> ' disagreements with Owner. No Work shall be delayed or postponed pending resolution of <br /> Disputes or disagreements, except as permitted by paragraph 15.04 or as Owner and Contractor <br /> may otherwise agree in writing. <br /> ' ARTICLE 14 TIME LIMITATIONS AND JURISDICTION <br /> 14.1 General <br /> ' A. The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when <br /> they arise. The parties intend that all Claims and Disputes be resolved quickly and expeditiously <br /> ' and desire to avoid claims and Disputes that relate back to events or Work occurring months <br /> before. The parties desire to avoid litigation and the costs and expense of Claims and Disputes at <br /> the end of the Project. <br /> ' B. Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or <br /> Contract Claim of any kind whatsoever, must be submitted, if at all, to the Owner or Owner's <br /> Representative no later than thirty (30) days after Notice was first required to be given by the <br /> ' Contractor as provided in ARTICLE 10. NOTICE TO OWNER. Failure to submit a Contract <br /> Claim within the thirty (30) days of the date Notice was required pursuant to ARTICLE 10. <br /> NOTICE TO OWNER constitutes a complete waiver of and bar to the Contract Claim, and <br /> ' Contractor is estopped from later asserting a Contract Claim or seeking any relief or remedy <br /> relating to the Dispute for which it failed to submit a Claim. <br /> C. Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever against <br /> ' the Owner on any Contract Claim or Dispute after the expiration of one hundred eighty (180) <br /> days from Physical Completion. <br /> D. Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring <br /> prior to Substantial Completion shall be deemed to have accrued in any and all events not later <br /> than such date of Substantial Completion. <br /> PSO6 REROUTE 007213 -61 <br /> WO NO.—UP3583 MAY 2016 <br />