I <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 20 00 <br /> PRICE AND PAYMENT PROCEDURES <br /> f. Perform specified construction Quality Assurance/Quality Control activities. <br /> g.Perform specified Quality Control testing,inspection,monitoring,documenta- <br /> tion,and reporting,and facilitate Quality Assurance testing,inspection,monitoring, <br /> and documentation activities being conducted by representatives of the Port and the <br /> City. <br /> h. Obtain and submit materials and equipment tests and certifications,guarantees, <br /> warranties,and other information for controlling the quality of the work. <br /> i.Prepare and submit specified Record and As-Built Drawings. <br /> 2. Payment for Field Engineering and Surveying shall be on the basis of the <br /> lump sum price stated in the Bid Form. Measurement for this pay item shall be estimated <br /> on the basis of the percent complete, relative to the overall bid price and the actual <br /> progress toward project completion. <br /> 3. Item 3: Temporary Erosion and Sedimentation Control, Section 01 57 13. <br /> Work under this pay item includes, and is not limited to: installing and maintaining all <br /> necessary stormwater management, surface water runoff control, and temporary erosion <br /> and sedimentation control (TESC) measures and best management practices (BMPs) <br /> including, but not limited to: diverting stormwater to limit runoff from entering <br /> excavations; supplying, installing, and maintaining catch basin inlet protection and <br /> temporary plugs in storm drain lines that are located within or near the work area; <br /> supplying, installing, and maintaining all necessary temporary sedimentation and erosion <br /> control measures needed to protect partially completed work and prevent sediment <br /> 111 <br /> transport from exposed soil surfaces and temporary stockpiles to surface water or <br /> adjacent work and non-work areas; and management of stormwater in accordance with <br /> the Specifications. <br /> Payment for Temporary Erosion and Sedimentation Control shall be on the basis of the <br /> lump sum price stated in the Bid Form. Measurement for this pay item shall be estimated <br /> on the basis of the percent complete, relative to the overall bid price and the actual <br /> progress toward project completion. 111 <br /> 4. Item 4: Traffic Control, Section 01 50 00. <br /> Includes, and is not limited to: redirecting foot traffic around and/or through the work <br /> area, establishing separate control setups if construction is taking place at more than one <br /> location or heading, setting up and taking down traffic control measures as required when <br /> work is in progress or shut down, establishing and maintaining detours around the work <br /> zone,including maintaining continuous access for Port operations,in accordance with the <br /> requirements of Section 01 50 00, Temporary Facilities and Controls. The Contractor's 111 <br /> payment for this item shall be by Lump Sum. Measurement for this pay item shall be <br /> estimated on the basis of the percent complete, relative to the overall bid price and the <br /> actual progress toward project completion. <br /> 5. Item 5: Trench Safety and Shoring Systems, Section 31 23 35. <br /> Work under this pay item includes all design, materials, labor,equipment, and incidentals <br /> required to complete trench safety and excavation shoring associated with the PSO6 <br /> Reroute work, including, and not limited to, furnishing, installing, maintaining and <br /> removal of trench safety and shoring systems. The work includes shoring, sheeting, <br /> trench boxes, sloping, inspection, and any other materials, equipment and oversight <br /> necessary for trench safety in accordance with all applicable local, state, and federal <br /> requirements. <br /> I <br /> PSO6 REROUTE 012000-4111 <br /> WO No.—UP3583 MAY 2016 <br /> I <br />