Laserfiche WebLink
I <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 20 00 <br /> PRICE AND PAYMENT PROCEDURES <br /> ' Payment for Shoring shall be on the basis of the lump sum price stated in the Bid Form. <br /> Measurement for this pay item shall be estimated on the basis of the percent complete, <br /> relative to the overall bid price and the actual progress toward project completion. <br /> 6. Item 6: Dewatering and Disposal, Section 31 23 35. <br /> Work under this pay item includes, and is not limited to, all design, materials, labor, <br /> equipment, and incidentals required to complete excavation dewatering, and disposal <br /> associated with the PSO6 Reroute work, including, and not limited to: furnishing, <br /> installing, operating and maintaining effective dewatering systems; collecting, storing, <br /> conveying, and metering water; obtaining a City of Everett discharge authorization and <br /> paying fees associated with discharge of water to the sanitary sewer system,and all other <br /> related work as specified in Section 015713. Payment for Dewatering and Disposal shall <br /> be on the basis of the lump sum price stated in the Bid Form. Measurement for this pay <br /> item shall be estimated on the basis of the percent complete, relative to the overall bid <br /> price and the actual progress toward project completion. <br /> 7. Item 7: Furnish and Install New Tie-backs, Section 31 51 00. <br /> Measurement and payment for this pay item shall be per each and shall include the <br /> furnishing of all necessary materials, equipment, tools, labor, testing, and all incidental <br /> ' expenses and materials required to install the tieback anchors and waler system and <br /> provide a completed operable system. <br /> 8. Item 8: Detension, Cut, Remove and Dispose Existing Tie-backs and Deadmen, Section <br /> 31 23 35. Measurement for this pay item shall be estimated on the basis of the percent <br /> complete,relative to the overall bid price and the actual progress toward item completion. <br /> Payment for this item shall be on the basis of the lump sum price stated in the Bid Form. <br /> 9. Item 9: Furnish and Install 36-inch, Triple Wall Polypropylene, Combined Sewer Pipe, <br /> Section 33 30 00. Work under this pay item includes, and is not limited to, all design, <br /> materials, labor, equipment and incidentals required to provide 36-inch, Triple Wall <br /> Polypropylene piping, complete the PSO6 reroute work including, and not limited to: <br /> excavating, stockpiling, hauling, trenching, piping, backfilling including reuse of <br /> excavated materials for backfill, condition, placement and compaction of backfill, <br /> temporary bypass pumping, connection to and plugging of existing piping. Any <br /> additional cost for using imported materials for backfill shall be paid under Item 18, <br /> Furnish and Install Structural Fill. <br /> Payment for this item shall be by the linear foot of pipe installed and measurement based <br /> on linear feet of pipe on centerline from center of structure to center of structure. <br /> 10. Item 10: Furnish and Install Steel Piles for New Manhole Platform, Section 31 62 16. <br /> Work under this pay item shall include all design, materials, labor, equipment, and <br /> incidentals required to complete installation of steel piling, including splicing, cutoff and <br /> incidental items. Measurement and payment for this pay item shall be per each. <br /> 11. Item 11: Furnish and Install Locking Water Tight Frame and Cover for Manhole X17, <br /> Section 33 30 00. Payment for this pay item shall be on the basis of Lump Sum Price <br /> stated in the Bid Form and shall include the furnishing of all necessary materials, <br /> equipment,tools,labor,testing, and all incidental expenses and materials,not included in <br /> other bid items, required to furnish and install locking watertight frame and cover for the <br /> existing manhole. <br /> 1 12. Item 12: Concrete Reinforcement, Section 03 20 00. Includes but is not limited to: the <br /> furnishing of all necessary materials, equipment, tools, labor, testing, and all incidental <br /> PSO6 REROUTE 012000-5 <br /> WO No.—UP3583 MAY 2016 <br /> I <br />