My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 25 00 <br /> SUBSTITUTION PROCEDURES <br /> SECTION 01 25 00-SUBSTITUTION PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Quality assurance. <br /> B. Product substitution procedures. <br /> C. Installer substitution procedures. <br /> 1.2 QUALITY ASSURANCE <br /> A. Contract is based on products and standards established in Contract Documents without <br /> consideration of proposed substitutions. <br /> B. Products specified define standard of quality, type, function, dimension, appearance, and <br /> performance required. <br /> C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do <br /> not substitute products unless substitution has been accepted and approved in writing by City. <br /> 1.3 PRODUCT SUBSTITUTION PROCEDURES <br /> A. Engineer will consider requests for substitutions only within 15 days after date established in <br /> Notice to Proceed. <br /> B. Substitutions may be considered when a product becomes unavailable through no fault of <br /> Contractor. <br /> C. Document each request with complete data, substantiating compliance of proposed substitution <br /> with Contract Documents,including: <br /> 1 1. Manufacturer's name and address, product, trade name, model, or catalog number, <br /> performance and test data,and reference standards. <br /> 2. Itemized point-by-point comparison of proposed substitution with specified product, <br /> listing variations in quality,performance,and other pertinent characteristics. <br /> 3. Reference to Article and Paragraph numbers in Specification Section. <br /> 4. Cost data comparing proposed substitution with specified product and amount of net <br /> change to Contract Sum. <br /> 5. Changes required in other Work. <br /> 6. Availability of maintenance service and source of replacement parts as applicable. <br /> 7. Certified test data to show compliance with performance characteristics specified. <br /> 8. Samples when applicable or requested. <br /> 9. Other information as necessary to assist Engineer's evaluation. <br /> PSO6 REROUTE 012500- 1 <br /> WO No.—UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.